Installation
ST88-21 C/Ku-Band TVRO
3-26
WARNING:
Hoisting with other than a webbed four-part sling may result in
catastrophic crushing of the radome. Refer to the specifications and drawings for the
fully assembled weight of your model Antenna/Radome and assure that equipment used
to lift/hoist this system is rated accordingly.
CAUTION:
The antenna/radome assembly is very light for its size and is subject to
large swaying motions if hoisted under windy conditions. Always ensure that tag lines,
attached to the radome base frame, are attended while the antenna assembly is being
hoisted to its assigned location aboard ship.
1.
Enter the ADE and stow the antenna
pedestal using the Stow Kit (provided)
and the instruction in the Maintenance
section of the antenna manual.
2.
Attach eye-bolts or shackles (properly
rated for the weight to be lifted) to four
equidistant lifting point holes around
the perimeter of the Base Frame.
3.
Attach properly rated web lifting straps
to the eye-bolts, or shackles.
4.
Attach appropriate length of rope tag
lines to the Base Frame.
5.
The ADE is now ready to hoist onto the
ship.
3.10.
Installing The ADE
3.10.1.
Hoist
WARNING:
Hoisting with other than a webbed four-part sling may result in catastrophic
crushing of the radome. Refer to the specifications and drawings for the fully assembled
weight of your model Antenna/Radome and assure that equipment used to lift/hoist this
system is rated accordingly.
CAUTION:
The antenna/radome assembly is very light for its size and is subject to large
swaying motions if hoisted under windy conditions. Always ensure that tag lines, attached
to the radome base frame, are attended while the antenna assembly is being hoisted to its
assigned location aboard ship.
1.
Assure that the antenna is restrained before hoisting. Check that all nuts on the base frame assembly
are tightened according the torque values listed below:
2.
Using a four-part lifting sling, and with a tag line attached to the radome base frame, hoist the
antenna assembly to its assigned location aboard ship by means of a suitably-sized crane or derrick.
Содержание ST88-21 C/Ku-Band TVRO
Страница 4: ......
Страница 10: ...Table of Contents x This Page Intentionally Left Blank ...
Страница 14: ...Introduction ST88 21 C Ku Band TVRO 1 4 This Page Intentionally Left Blank ...
Страница 22: ...Site Survey ST88 21 C Ku Band TVRO 2 8 This Page Intentionally Left Blank ...
Страница 56: ...Installation ST88 21 C Ku Band TVRO 3 34 This Page Intentionally Left Blank ...
Страница 60: ...Setup Ships Gyro Compass ST88 21 C Ku Band TVRO 5 2 This Page Intentionally Left Blank ...
Страница 64: ...Determine Internal Tracking Receiver Settings ST88 21 C Ku Band TVRO 6 4 This Page Intentionally Left Blank ...
Страница 68: ...Setup Home Flag Offset ST88 21 C Ku Band TVRO 7 4 This Page Intentionally Left Blank ...
Страница 76: ...Setup Searching ST88 21 C Ku Band TVRO 9 6 This Page Intentionally Left Blank ...
Страница 112: ...Maintenance and Troubleshooting ST88 21 C Ku Band TVRO 13 28 This Page Intentionally Left Blank ...
Страница 120: ...Model ST88 21 Drawings ST88 21 C Ku Band TVRO 15 2 This Page Intentionally Left Blank ...
Страница 125: ......
Страница 128: ......
Страница 137: ......
Страница 141: ......
Страница 142: ......
Страница 143: ......