ST88-21 C/Ku-Band TVRO
Installation
3-11
3.
Remove the straps that restrain the radome
cap. Leave the radome cap on the pallet
with the radome panels for use during the
radome assembly.
4.
Use diagonal cutters, or shears, to cut the
bands that restrain the Hardware kit in the
crate. Leave the hardware kit on the pallet
with the radome panels for use during the
radome assembly.
5.
Use diagonal cutters, or shears, to cut the
bands that restrain the box of Silicon
Adhesive in the crate. Leave the Silicon
Adhesive on the pallet with the radome
panels for use during the radome assembly.
3.8.
Assembling the ADE
3.8.1.
Preparing for Assembly of the ADE
Read this entire assembly procedure
before
beginning.
Refer to the System Block diagram, General Assembly, Baseframe Assembly, Radome Assembly and Radome
Installation Arrangement drawings for your system.
Select a secure assembly site that provides enough area to work with the large radome panels while sub-
assembling the baseframe, sections of the radome, Antenna Pedestal and Reflector & Feed. The area should
be a clean, flat location, free of rocks & debris (ie concrete). The site should also provide protection from
wind, rain and other adverse weather. A hoist, or small crane, is needed to assemble these sub-assemblies to
form the final ADE Assembly.
As an example, you might sub-assemble everything on the pier where the ship will tie up, then use the crane
to put the sub-assemblies together and lift the whole ADE up to the mounting location on the ship.
You can change order of these steps, however, in the end the objective is to have a well sealed
radome with flanges that are clean of excess caulking. In addition it is important that the ADE is
structurally sound for severe weather conditions.
3.8.2.
Sub-assemble the Base Frame Assembly
Refer to the Base Frame Assembly drawing for your system and the procedure below.
NOTE:
Unless otherwise indicated, all nuts and bolts should be assembled with Loctite
2760 or its equivalent.
WARNING:
Assure that all nut and bolt assemblies are tightened according to
the tightening torque values listed below:
SAE Bolt Size
Inch Pounds
Metric Bolt Size
Kg-cm
1/4-20
75
M6
75.3
5/l6-18
132
M6
225
3/8-16
236
M12
622
1/2-13
517
Содержание ST88-21 C/Ku-Band TVRO
Страница 4: ......
Страница 10: ...Table of Contents x This Page Intentionally Left Blank ...
Страница 14: ...Introduction ST88 21 C Ku Band TVRO 1 4 This Page Intentionally Left Blank ...
Страница 22: ...Site Survey ST88 21 C Ku Band TVRO 2 8 This Page Intentionally Left Blank ...
Страница 56: ...Installation ST88 21 C Ku Band TVRO 3 34 This Page Intentionally Left Blank ...
Страница 60: ...Setup Ships Gyro Compass ST88 21 C Ku Band TVRO 5 2 This Page Intentionally Left Blank ...
Страница 64: ...Determine Internal Tracking Receiver Settings ST88 21 C Ku Band TVRO 6 4 This Page Intentionally Left Blank ...
Страница 68: ...Setup Home Flag Offset ST88 21 C Ku Band TVRO 7 4 This Page Intentionally Left Blank ...
Страница 76: ...Setup Searching ST88 21 C Ku Band TVRO 9 6 This Page Intentionally Left Blank ...
Страница 112: ...Maintenance and Troubleshooting ST88 21 C Ku Band TVRO 13 28 This Page Intentionally Left Blank ...
Страница 120: ...Model ST88 21 Drawings ST88 21 C Ku Band TVRO 15 2 This Page Intentionally Left Blank ...
Страница 125: ......
Страница 128: ......
Страница 137: ......
Страница 141: ......
Страница 142: ......
Страница 143: ......