
ST144-21 C/Ku-Band TVRO
Site Survey
2-7
2.8.4.
The AC power for the ACU and other below decks equipment is not required to be from a UPS (same one that
supplies power to the ADE), but it is recommended.
ACU Power Cable/Outlet
Power cable shall comply with the provisions of IEC 60092-350 and -351 in so far as practicable.
2.8.5.
Use good quality shielded cable (twisted pairs, individually foil wrapped, outer foil with braid overall is best)
You only need 2-wire for NMEA signal, 4-wire for Step-By-Step and 5-wire for Synchro … always use shielded
cable. Be cautious of length and gauge of the run for voltage loss issues.
Gyro Compass Cable
2.8.6.
Refer to the Installation chapter for grounding/bonding information.
Grounding
Содержание ST144-21
Страница 6: ......
Страница 14: ...Introduction ST144 21 C Ku Band TVRO 1 4 This Page Intentionally Left Blank ...
Страница 22: ...Site Survey ST144 21 C Ku Band TVRO 2 8 This Page Intentionally Left Blank ...
Страница 52: ...Setup Ships Gyro Compass ST144 21 C Ku Band TVRO 5 2 This Page Intentionally Left Blank ...
Страница 56: ...Determine Internal Tracking Receiver Settings ST144 21 C Ku Band TVRO 6 4 This Page Intentionally Left Blank ...
Страница 60: ...Setup Home Flag Offset ST144 21 C Ku Band TVRO 7 4 This Page Intentionally Left Blank ...
Страница 68: ...Setup Searching ST144 21 C Ku Band TVRO 9 6 This Page Intentionally Left Blank ...
Страница 104: ...Maintenance and Troubleshooting ST144 21 C Ku Band TVRO 13 28 This Page Intentionally Left Blank ...
Страница 112: ...Model ST144 21 Drawings ST144 21 C Ku Band TVRO 15 2 This Page Intentionally Left Blank ...
Страница 117: ......
Страница 120: ......
Страница 122: ......
Страница 124: ......
Страница 125: ......
Страница 138: ......
Страница 139: ......
Страница 140: ......