
TB-9031
Page 6 of 11
© 2022 DESCO INDUSTRIES INC
Employee Owned
SCS
- 926 JR Industrial Drive, Sanford, NC 27332
East: (919) 718-0000 | West: (909) 627-9634 • Website:
5. Continue to press and hold the Verification Tester's
WRIST STRAP test switch. Simultaneously, press
and hold the Verification Tester's LOW BODY
VOLTAGE test switch. The monitor's operator LED
will remain green, and no audible alarm will sound.
This verifies the operator circuit's low body voltage
limit.
Figure 11. Pressing the WRIST STRAP and LOW BODY
VOLTAGE test switches simultaneously
6. Continue to press and hold the Verification Tester's
WRIST STRAP test switch. Simultaneously, press
and hold the Verification Tester's HIGH BODY
VOLTAGE test switch. The monitor's green operator
LED will illuminate continuously, its red LED will
blink. This verifies the operator circuit's high body
voltage limit.
Figure 12. Pressing the WRIST STRAP and HIGH BODY
VOLTAGE test switches simultaneously
7. Disconnect the mono cable from the monitor.
VERIFYING THE MAT CIRCUIT
8. Connect the red test lead to red banana jack located
at the top of the Verification Tester.
9. Disconnect the monitor's white mat monitor cord
from its worksurface mat and turn it over to expose
its 10 mm snap.
10. Clip the red test lead's mini grabber to the 10 mm
snap on the white mat monitor cord.
11. Wait approximately 5 seconds for the monitor's mat
LED to illuminate red and sound its audible alarm.
12. Press and hold the Verification Tester's SOFT
GROUND test switch. The monitor's mat LED will
illuminate green, and its audible alarm will stop
after approximately 3 seconds. This verifies the mat
circuit's resistance limit.
Figure 13. Connecting the Verification Tester to WS
Aware Monitor's mat monitor cord
Monitor's
Mat Monitor Cord
Figure 14. Pressing the SOFT GROUND test switch
13. Disconnect the red test lead from the monitor's
white mat monitor cord.
14. Reinstall the white mat monitor cord to the
worksurface mat.