SCS CTE701 Скачать руководство пользователя страница 2

TB-9031

 Page 2 of 11

© 2022 DESCO INDUSTRIES INC

Employee Owned

SCS 

- 926 JR Industrial Drive, Sanford, NC 27332

East: (919) 718-0000 | West: (909) 627-9634 • Website: 

StaticControl.com

Features and Components

A. Operator Dual-wire Jack:

 Connect one end of the 

included 3.5 mm mono cable here, and the other end 

into the monitor's operator jack.

B. Soft/Metal Ground Banana Jack:

 Connect the 

banana plug terminal of the red test lead here, and the 

other end to the monitor's mat or tool ground circuit.

C. Reference Ground Banana Jack:

 Connect the 

banana plug terminal of the black test lead here, and 

the other end to equipment ground.

D. High Body Voltage Test Switch:

 Simulates a 

BODY VOLTAGE FAIL condition on the monitor's 

operator circuit when pressed.

E.  Low Body Voltage Low Test Switch:

 Simulates 

a BODY VOLTAGE PASS condition on the monitor's 

operator circuit when pressed.

F.  Soft Ground Test Switch:

 Simulates a MAT PASS 

condition on the monitor when pressed.

G. Wrist Strap Test Switch:

 Simulates a OPERATOR 

PASS condition on the monitor when pressed.

H. Test Limit DIP Switch:

 Configures the test limits on 

the CTE701 Verification Tester.

I.  High Metal Ground Test Switch:

 Simulates a TOOL 

FAIL condition on the monitor when pressed.

J.  High EMI Test Switch:

 Simulates an EMI FAIL 

condition on the monitor's tool circuit when pressed.

K. Low EMI Test Switch:

 Simulates an EMI PASS 

condition on the monitor's tool circuit when pressed.

L.  Low Metal Ground Test Switch:

 Simulates a TOOL 

PASS condition on the monitor when pressed.

M. Low Battery LED:

 Illuminates when the battery 

needs to be replaced.

N. Power LED:

 Illuminates when the CTE701 

Verification Tester is powered.

O. Power Switch:

 Slide to the left to power the 

Verification Tester OFF. Slide to the right to power the 

Verification Tester ON.

Figure 2. CTE701 Verification Tester features and 

components

D

E

F

G

H

J

I

K
L

N
O

M

A

B

C

Содержание CTE701

Страница 1: ...nds annual calibration of workstation monitors and the CTE701 Verification Tester The CTE701 Verification Tester meets ANSI ESD S20 20 and Compliance Verification ESD TR53 November 2022 The SCS CTE701 Verification Tester can be used with the following items Item Description 770067 WS Aware Monitor 770068 WS Aware Monitor CTC061 3 242 WW WS Aware Monitor CTC061 RT 242 WW WS Aware Monitor CTC062 RT ...

Страница 2: ...operator circuit when pressed F Soft Ground Test Switch Simulates a MAT PASS condition on the monitor when pressed G Wrist Strap Test Switch Simulates a OPERATOR PASS condition on the monitor when pressed H Test Limit DIP Switch Configures the test limits on the CTE701 Verification Tester I High Metal Ground Test Switch Simulates a TOOL FAIL condition on the monitor when pressed J High EMI Test Sw...

Страница 3: ...FF 14 ohms OFF ON OFF OFF 15 ohms ON OFF OFF OFF 16 ohms OFF OFF OFF OFF EMI The EMI high frequency signal is configured with switch 9 The CTE701 Verification Tester provides two different levels of high frequency signal elevated and normal Pressing the HIGH EMI pushbutton will load a high signal level within its range Pressing the LOW EMI pushbutton will load a low signal within its range Switch ...

Страница 4: ...OLTAGE test switches simultaneously 6 Continue to press and hold the Verification Tester s WRIST STRAP test switch Simultaneously press and hold the Verification Tester s HIGH BODY VOLTAGE test switch The monitor s green operator LED will illuminate continuously its red LED will blink and an audible alarm will sound This verifies the operator circuit s high body voltage limit Figure 6 Pressing the...

Страница 5: ...und 18 Set the variable DC power supply to 4 0 V The monitor s Iron LED should illuminate green and its audible alarm should stop 19 Disconnect the variable DC power supply from the monitor and ground Connect its positive terminal to ground and its negative terminal to the monitor s yellow alligator cord 20 Verify that the variable DC power supply is still set to 4 0 V The monitor s Iron LED shoul...

Страница 6: ...e 12 Pressing the WRIST STRAP and HIGH BODY VOLTAGE test switches simultaneously 7 Disconnect the mono cable from the monitor VERIFYING THE MAT CIRCUIT 8 Connect the red test lead to red banana jack located at the top of the Verification Tester 9 Disconnect the monitor s white mat monitor cord from its worksurface mat and turn it over to expose its 10 mm snap 10 Clip the red test lead s mini grabb...

Страница 7: ...ch The monitor s tool LED will illuminate red and its audible alarm will sound This verifies the tool circuit s impedance limit 20 Press and hold the Verification Tester s METAL GROUND PASS test switch Simultaneously press and hold the Verification Tester s EMI LOW test switch The monitor s tool LED will remain green and no audible alarm will sound This verifies the operator circuit s low EMI volt...

Страница 8: ...s the tool circuit s impedance limit Figure 21 Pressing the METAL GROUND PASS test switch 5 Press and hold the Verification Tester s METAL GROUND FAIL test switch The monitor s tool LED will illuminate red and its audible alarm will sound This verifies the tool circuit s impedance limit Figure 22 Pressing the METAL GROUND FAIL test switch 6 Press and hold the Verification Tester s METAL GROUND PAS...

Страница 9: ...necting the Verification Tester to the Ground Man Plus Workstation Monitor s operator jack Figure 26 Pressing the WRIST STRAP test switch Figure 27 Pressing the WRIST STRAP and LOW BODY VOLTAGE test switches simultaneously 4 Press and hold the Verification Tester s WRIST STRAP test switch The monitor s operator LED will illuminate green and its audible alarm will stop This verifies the operator ci...

Страница 10: ...GROUND PASS test switch The monitor s tool LED will illuminate green and its audible alarm will stop This verifies the tool circuit s impedance limit 12 Press and hold the Verification Tester s METAL GROUND FAIL test switch The monitor s tool LED will illuminate red and its audible alarm will sound This verifies the tool circuit s impedance limit 13 Press and hold the Verification Tester s METAL G...

Страница 11: ... Battery LED illuminates red Open the compartment located on the back of the tester to replace the battery The tester uses one 9V alkaline battery Ensure that the battery s polarities are oriented correctly to avoid possible circuit damage Specifications Operating Temperature 50 to 95 F 10 to 35 C Environmental Requirements Indoor use only at altitudes less than 6500 ft 2 km Maximum relative humid...

Отзывы: