FOR THE INSTALLER: Final Check List
1. Is the ice system installed indoors in
a location where the air and water
temperatures are controlled, and where
they do not exceed the design
limitations?
2. Is there an electrical service
disconnect within sight of the installed
machine? Has the voltage been
checked, and compared to nameplate
requirements?
3. Have all the plumbing connections
been made and checked for leaks?
4. Has the machine and bin been
leveled?
5. Is there a minimum of 6" clearance at
the rear, left, and right of the machine
for proper service access and air
circulation?
6. Is the water pressure a minimum of
20 psig?
7. Has the machine been secured to the
bin?
8. If stacked, has the stacking kit been
installed?
9. Is there a water shut off valve
installed near the machine?
10. Have the shipping blocks been
removed from under the gearmotor, the
top of the ice chute, and from between
the gearmotor and the right side panel?
LEVELED?
POWER
SUPPLY?
PLUMBING?
MACHINE
SECURE TO
BIN?
DRAINS?
FM1500
February, 1989
Page 8