![Schweitzer Engineering Laboratories SEL-251 Скачать руководство пользователя страница 167](http://html.mh-extra.com/html/schweitzer-engineering-laboratories/sel-251/sel-251_instruction-manual_1216702167.webp)
Date Code 20000421
Maintenance and Testing
7-5
SEL-251, -2, -3 Instruction Manual
Method:
Refer to the information sticker on the rear panel of the relay. Please read the
information on this sticker before applying power to the relay or starting tests. Be
sure your dc supply is correctly adjusted for the control and logic input requirements.
♦
♦
Step 3
Purpose:
Verify the communications interface setup.
Method:
Connect a computer terminal to Port 2F on the relay front panel. The terminal
should be configured to 2400 baud, eight data bits, two stop bits, and no parity. The
relay is shipped from the factory with Port 2 set to 2400 baud and Port 1 set to 300
baud.
Section 3: Communications
provides additional details on port configura-
tion. Baud rate selection is described under
Jumper Selection
in
Section 6:
Installation
. Figure 7.2 shows the typical communication interface setup for testing
purposes.
Figure 7.2: Communication Interface Setup
♦
♦
Step 4
Purpose:
Establish control power connections.
Method:
Connect a frame ground to terminal 46 on the rear panel and connect rated control
power to terminals 44 and 45. Polarity is unimportant. Relays supplied with 125 or
250 V power supplies may be powered from a 115 Vac wall receptacle for testing.
In the final installation, we recommend that the relay receive control power from the
station dc battery to avoid losing events stored in volatile memory if station service
is lost.