![SCHUNK SPG 100 Скачать руководство пользователя страница 17](http://html.mh-extra.com/html/schunk/spg-100/spg-100_assembly-and-operational-manual_1216049017.webp)
Assembly
02.00 | SPG 100 | Assembly and Operating Manual | en | 0389423
17
1. Ansicht
1+2 2 x M8 / 10 deep for lateral hose-free
direct connection
3
M8 / 10 deep for lateral air purge
connection
2. Ansicht
1+2 2 x M8 / 10 deep for hose-free direct
connection from above
3
M8 / 10 deep for air purge
connection from above
3. Ansicht
1+2 2 x R1/4" / 15 deep for hose connection
3
R1/4" / 15 deep for air purge
connection
• Open only the air connections that are needed.
• Close unused main air connections using the screw plugs from
the enclosed pack.
• For a hose-free direction connection, use the O-rings from the
enclosed pack.
SDV-P 07 from accessories supplied
1
Valve
2
SDV-P 07 from accessories supplied
In case of design SPG 100 SDV-P please note:
The gripper has to be connected as shown on the adjoining circuit
diagram.
4.3 Mounting the sensor
NOTE
Observe the assembly and operating manual of the sensor for
mounting and connecting.
The product is prepared for the use of sensors.
• For the exact type designations of suitable sensors, please see
catalog datasheet and Link Übersicht Sensoren.
• For technical data for the suitable sensors, see assembly and
operating manual and catalog datasheet.
– The assembly and operating manual and catalog datasheet
are included in the scope of delivery for the sensors and are
available at schunk.com.
• Information on handling sensors is available at schunk.com or
from SCHUNK contact persons.