
Commissioning
01.00 | EGM | Assembly and Operating Manual | en | 389539
39
6.2 Operation with controller ECG-C or ECG-W
Ø
Repeat the following steps each time the workpiece type is
changed:
■
Connecting plug is adapted,
Turning the connecting plug (EGM B
32].
■
Product and controller are ready for operation.
■
Product is demagnetized.
Ø
Position the product on the contact surface of the workpiece.
Ø
Magnetize the product.
Ø
Raise the workpiece somewhat and execute a brief test motion.
✓
If the workpiece is not held securely, reduce the speed and
repeat the test.
✓
If required, use a pole extension or stop.
Ø
Test the holding force for the full shifting motion:
✓
Raise and shift workpiece.
✓
If the workpiece is not held securely, reduce the speed and
repeat the test.
✓
If required, use a pole extension or stop.
Ø
Set the workpiece down at the destination
Ø
Demagnetize the product and move it away from the
workpiece.
The workpiece must remain secure at the depositing location.
NOTE
questions contact SCHUNK.