OPERATION
DHX-360/DHX-600 03/21
Operation Section 4-10
O
PE
R
AT
IO
N
© 2021 Alamo Group Inc.
1. Remove the field operation lock pin from the lock position and install it below the frame in the storage
position.
See Graphic below.
.
2. Lift the harrow using the Main Lift Circuit until the
hydraulic cylinders are fully retracted.
3. Rotate the Wing wheels into transport position. This
will also release the wing tension link locks. If the
tension link locks do not come undone you may
have to back up slightly to release the lock if it is
wedged. Note: The hydraulic cylinders for the wing
wheels and wing lock are on one circuit. The wheel
cylinders will not actuate until the lock cylinders
retract completely as the lock cylinders take less
pressure.
Содержание DHX-360
Страница 3: ......
Страница 6: ......
Страница 9: ...Safety Section 1 1 SAFETY SECTION ...
Страница 21: ...SAFETY DHX 360 DHX 600 03 21 Safety Section 1 13 SAFETY 2021 Alamo Group Inc ...
Страница 25: ...SAFETY DHX 360 DHX 600 03 21 Safety Section 1 17 SAFETY 2021 Alamo Group Inc ...
Страница 27: ...SAFETY DHX 360 DHX 600 03 21 Safety Section 1 19 SAFETY 2021 Alamo Group Inc ...
Страница 29: ...SAFETY DHX 360 DHX 600 03 21 Safety Section 1 21 SAFETY 2021 Alamo Group Inc ...
Страница 31: ...SAFETY DHX 360 DHX 600 03 21 Safety Section 1 23 SAFETY 2021 Alamo Group Inc ...
Страница 33: ...Introduction Section 2 1 2021 Alamo Group Inc INTRODUCTION SECTION ...
Страница 39: ...Assembly Section 3 1 2019 Alamo Group Inc ASSEMBLY SECTION ...
Страница 42: ......
Страница 43: ...Operation Section 4 1 OPERATION SECTION ...
Страница 74: ......
Страница 75: ...Maintenance Section 5 1 2021 Alamo Group Inc MAINTENANCE SECTION ...
Страница 79: ...MAINTENANCE DHX 360 DHX 600 03 21 Maintenance Section 5 5 2021 Alamo Group Inc MAINTENANCE ...
Страница 80: ......
Страница 81: ......
Страница 82: ...DHX 360 DHX 600 03 21 DH60 010C Printed Canada ...