18
257 838
08.2012
A suitable installation system must be used to ensure that the modules are fixed in position such that there are
no fatal injuries or damage to people or property.
The module can be installed by means of the struts mounted on the reverse side using the Schüco MSE 100
installation system. A detailed description of the installation sequences can be found in the Schüco Solar MSE
100 installation and operating instructions (Art. No. 259 708).
WARNING
► Earth connections must not be used to secure the complete installation
mechanically to load-bearing surfaces or frames.
Modules and installation systems must be connected using equipotential bonding in accordance with regional
and national standards and regulations.
If necessary, connect lightning protection and over voltage protection (OVP) devices.
If a building has a lightning protection system, the photovoltaic installation must be integrated into the lightning
protection concept by specialists.
Depending on the type of installation, MPE modules can be operated using
inverters with or without transformers.
Schüco recommends the following inverters:
Schüco:
SGI 1500T plus 02 - SGI 4500T plus 02, SGI 2000 - SGI 5500
Or alternatively:
SMA:
SB 1700 - SB 3800, SMC 5000A, SMC 6000A, SMC 7000HV,
SB 2100TL, SB 3300TL HC, SB 3000 TL20 - SB 5000TL20
See: Installation and operating instructions for „inverters“
The maximum permissible load-bearing capacity also
then applies for this type of fixing.
The mounting rails used must be designed to support
the expected snow and wind loads. The wind and
snow loads anticipated for the module may not
exceed the permitted load-bearing capacity of the
module.
Depending on the type and construction of the
mounting rails, the modules must be rear-ventilated
sufficiently to avoid a drop in yield or structural
damage.
6. Installation and electrical connection
7. Installation
8. Earth potential and bonding