background image

08.2012

257 838

15

WARNING

Do not dismantle or 

drop the module.

Ensure all contacts are 

kept clean and dry.

Do not bend the 

module.

Do not step on the 

module.

Use both hands!.
Do not lift up by the 

connector or sockets.

Do not use pointed or 

sharp objects with the 

module.

Maximum module load: 
< 2,4 kN/m²!

Sunlight must not be 

artificially concentrated 

and directed onto the 

module!

The use of suction 

cups is recommended 

for removing the 

modules from the 

packaging.

Do not expose the 

module to sunlight during 

installation; cover the front 

of the module with an 

opaque towel or similar.

Содержание MPE 100 AL 01

Страница 1: ...Neue Energien Modul Montage Deutsch English MPE 85 AL 01 MPE 90 AL 01 MPE 95 AL 01 MPE 100 AL 01...

Страница 2: ...08 2012 Montage und Bedienungsanleitung MPE Module Art Nr 257 838 08 2012 15 Installation and Operating Instructions MPE modules Art No 257 838 08 2012 15 Printed in Germany Copyright by Sch co Intern...

Страница 3: ...und Kenntnisvoraussetzungen der Verarbeiter Monteure Sch co setzt voraus dass die Montage nur durch fachlich qualifiziertes und autorisiertes Personal mit einem anerkannten Ausbildungsnachweis durch...

Страница 4: ...ung Mit der CE Kennzeichnung wird dokumentiert dass das Modul gem dem Typenschild die grundlegenden Anforderungen folgender einschl giger Richtlinien erf llt EN 61730 1 2007 EN 61730 2 2007 Niederspan...

Страница 5: ...den Anschlussdosen heben Modul nicht mit spitzen oder scharfen Gegenst nden bearbeiten Maximale Modullast 2 4 kN m Kein k nstlich konzentriertes Sonnenlicht auf das Modul richten Zur Entnahme der Modu...

Страница 6: ...kseite sind Aluminiumprofile f r die Befestigung an den Unterkonstruktionen aufgeklebt Nach der Entnahme der Module aus den Verpackungs einheiten und einer m glichen Zwischenlagerung d rfen die Profil...

Страница 7: ...er AL Serie weisen in den ersten 6 Wochen nach der Inbetriebnahme eine bis zu 18 h here elektrische Leistung auf als auf dem Typenschild angegeben Dies ist bei der Auslegung der Wechselrichter zu beac...

Страница 8: ...einen Fachbetrieb in das Blitzschutzkonzept eingebunden werden MPE Module k nnen abh ngig von der Art der Montage sowohl mit Trafo als auch trafolosen Wechselrichtern betrieben werden Sch co empfiehl...

Страница 9: ...spole sind ber Strangsicherungen im GAK abgesichert 9 Verschaltungskonzepte Verschaltung mit dem Sch co KSS System Schema B Die einzelnen Modulstr nge werden ber vorkonfektionierte Strangleitungen KSS...

Страница 10: ...tem Sch co Wechselrichter SGI 4500 9 2 Beispiel Verschaltung einer Aufdach Anlage mit KSS System und SMA Wechselrichter SMC 7000 HV achtung Bei der Parallelschaltung ist darauf zu achten dass maximal...

Страница 11: ...unterbrochen oder zerst rt werden berpr fen aller Anschlussleitungen und Steckverbinder auf mechanische Unversehrtheit und Korrosion berpr fen des Erdungswiderstandes des Gesamtsystems gem der region...

Страница 12: ...peraturkoeffizient T Pmpp K 0 21 Temperaturkoeffizient T Umpp K 0 30 Temperaturkoeffizient T Impp K 0 10 Temperaturkoeffizient T UOC K 0 30 Temperaturkoeffizient T ISC K 0 08 Systemspannung IEC U V 10...

Страница 13: ...ately 1 2 Training and qualification of the fabricators installers Sch co assumes that installation will only be carried out by technically qualified and authorised personnel with a recognised qualifi...

Страница 14: ...ngs and safety advice 4 1 CE marking The CE marking documents that in accordance with the classification plate the module meets the basic requirements of the following relevant guidelines EN 61730 1 2...

Страница 15: ...y the connector or sockets Do not use pointed or sharp objects with the module Maximum module load 2 4 kN m Sunlight must not be artificially concentrated and directed onto the module The use of sucti...

Страница 16: ...the rear of the modules for fixing to the mounting frames After removing the modules from the packing units and any possible interim storage the profiles must not come into contact with the glass surf...

Страница 17: ...ARNING In the first six weeks after commissioning the electrical output of MPE modules in the AL series is approx 18 higher than that specified on the classification plate This must be taken into acco...

Страница 18: ...protection system the photovoltaic installation must be integrated into the lightning protection concept by specialists Depending on the type of installation MPE modules can be operated using inverte...

Страница 19: ...iguration Connection using the Sch co parallel string interconnection system diagram B The individual module strings are connected in parallel fused and directly connected with the inverter via prefab...

Страница 20: ...ing the PSI system Sch co SGI 4500T inverter 9 2 Example connecting an on roof installation using the PSI system and SMA inverter SMC 7000 HV WARNING For parallel connection it must be ensured that on...

Страница 21: ...nce of the installation Check all the connector cables and plug in connectors for mechanical damage and corrosion Check the earthing resistance of the complete system in accordance with regional regul...

Страница 22: ...K 0 21 Temperatur coefficient T Umpp K 0 30 Temperatur coefficient T Impp K 0 10 Temperatur coefficient T UOC K 0 30 Temperatur coefficient T ISC K 0 08 Max system voltage IEC U V 1000 Max system volt...

Страница 23: ......

Страница 24: ...Kingston Milton Keynes MK10 0AL Phone 44 0 1908 282111 Fax 44 0 1908 289123 www schueco co uk Sch co International KG Karolinenstra e 1 15 33609 Bielefeld Deutschland Telefon 49 5 21 7 83 0 Telefax 49...

Отзывы: