5.  Commissioning 

 

If a power supply is present, the battery connected to the emergency light unit will be charged. The 
signal LED will indicate this state by means of a steady green light. 

 

  After the initial setup, the emergency battery must be charged for 12 hours. From a 

physical point of view, the full capacity of the battery is only available after 3 or 4 charge-
discharge cycles. 

 

If a battery contact failure is indicated despite an existing connection to a power supply and to the 
emergency battery, the emergency battery may be the cause, which might contain insufficient charge 
to be charged in the potentially explosive atmosphere. 
In this case, the emergency battery is to be removed as described in Section 6.3 and to be charged 
separately from the light fitting. With a 6 V charging voltage and 80 mA charging current, a discharged 
battery will be sufficiently charged within just 5 minutes for it to be reinserted into the light fitting, where 
it can continue to charge.  

 

Before commissioning this explosion-proof lighting fitting please check and ensure that: 

 

 the light fitting has been installed according to the regulations and in the allowed operating position. 

 

 the explosion-proof cable glands resp. explosion-proof locking screws are securely fixed in the 

housing (Torques see Chapter 3, Technical Data). 

 the pressing screw of every explosion-proof cable gland is tightened with the required torque 

(Torques see Chapter 3, Technical Data). 

 

 the connection cable has been firmly installed and is not subject to any tension whatsoever. 

 

  the bare conductor is fully inserted into the terminal and that no cable insulation is clamped. 

 

 the light fitting is closed correctly. 

 

 all gaskets are effective. 

 

 

the light fitting is not damaged whatsoever. 

 

5.1  Isolation measurement 

 

For measuring the isolating resistance the test voltage must be put on between the outer conductor 
and the  
earth conductor or between the neutral conductor and the earth conductor only. 
 
 
 
 
 
 
 
 
 
 
After finishing the isolation test the conductor between the mains and the light fitting must be 
reconnected safely. Before starting operation the connection of the neutral conductor must be safe for 
avoiding any damage whatsoever of the electronic control gear caused by any inadmissible excess-
voltage in case of an unbalanced mains load. (see Chapter 5.2) 

 
 
 
 
 

Содержание e864 12L Series

Страница 1: ...ends on the observance of all safety standards Exact knowledge about all applicable regulations and standards is mandatory for installation maintenance and repair of explosion proof equipment especial...

Страница 2: ...ubject to any kind of vibrations it is highly recommended to consult the Adolf Schuch GmbH before starting the installation Every structural modification will cause dangerous situations and consequent...

Страница 3: ...up of a series connection which itself is built up of parallel connections of single LEDs Failures of LEDs do not necessarily lead to a change in the power consumption which is recognized by the emerg...

Страница 4: ...itions after a correctly performed switching sequence at L1 terminal an operational life test is immediately initiated If the switching sequence is correctly carried out on L1 terminal an operational...

Страница 5: ...connection between the emergency light unit and the battery is re established 2 4 LED Signals The two colored LED red green which is integrated in the reflector of the light fitting does show the work...

Страница 6: ...the light fitting 3 Technical Data Series e864 12L Capacity of emergency battery Nominal operating time in case of emergency Index of luminous flux Explosion proof LED Emergency Light Fitting for oper...

Страница 7: ...ion position in any direction except upwards light output Rated luminous flux ca 16 with e864 12L42 ca 12 with e864 12L60 Spare battery Typ 8020 6 V 1 6 Ah NiCd 1 hour emergency light time standard ve...

Страница 8: ...fitting in an explosive dust atmosphere is depending on the properties of the surrounding dust Please ensure that there will be an adequate difference between the maximum surface temperature of the f...

Страница 9: ...es which are not used must be closed with the enclosed closure plug Torque see Chapter 3 Technical Data An inlaid dust protective disc if existing must be removed before The conductors must not be dam...

Страница 10: ...elivery state there is no electrical connection between the emergency battery and the emergency light unit If no power supply is present even if the light fitting is connected to the emergency battery...

Страница 11: ...k and ensure that the light fitting has been installed according to the regulations and in the allowed operating position the explosion proof cable glands resp explosion proof locking screws are secur...

Страница 12: ...s in 3 phase circuits and with a common neutral conductor N Light fittings with emergency light unit OK fault If the common neutral conductor is interrupted and voltage is present then light fittings...

Страница 13: ...have got thermal insulation characteristic features It is necessary to clean the fitting from dust regularly In case the dust layer may be higher than 5 mm it must be ensured that the surface tempera...

Страница 14: ...ctor with mounted LED modules has been described in the separate instructions which can be found attached to the spare parts to be supplied 6 5 Environmental advice This device has got an accumulator...

Страница 15: ...L 014124 04 15...

Страница 16: ...16 L 01412 4 04 The test certificates are ready to be loaded down from our homepage www schuch de or we shall send it on request Misprints modifications and errors are excepted...

Отзывы: