OPERATOR‘S MANUAL
1
8
NT2 rondo
Version: 27211 -
F
Schmalenberger GmbH + Co. KG
D-72072 Tübingen / Germany
6
Start-up / Operating
Never carry out a trial run with the motor as long as there is no water in the pump. A dry
run will destroy the mechanical seal in the pump!
•
Switch on the master switch
After switching on the master switch, wait for approx. 10 seconds until the initialisation of
the controller is complete.
•
Switching the pump on and off
The pump is switched on by pressing the switching button (Z). After 2 seconds the pump
can be switched off by pressing the button again or a signal can be sent to the pump (on-
off function).
The operating time of the pump can be set by a trained specialist in 4 minute intervals from
4 to 60 minutes. At the factory the operating time is set to D (continuous operation), see
section5.5 (Setting the operating time).
•
Water supply control
By turning the knob (K
W
) clockwise the water supply decreases, anti-clockwise it increa-
ses.
•
Air supply control / Air bubble bath
By turning the knob (K
L
) clockwise the air supply decreases, anti-clockwise it increases.
The air supply to the water causes the water jet to become softer (air bubble bath).
•
Direction of jet
The nozzle can be turned in any direction.
•
Counter-current swimming
Set the maximum jet speed. Swing the nozzle (Q) so that the water layer just under the
surface of the water begins to flow quickly.
fig. 27
K
L
Air supply regulator knob
K
W
Water supply regulatorknob
Q
Nozzle
Z
Switching button
8322
Содержание fluvo NT2 rondo
Страница 1: ...GB 27211 F 1 NT2 rondo D D F I E ...
Страница 25: ......
Страница 30: ...Schmalenberger GmbH Co KG D 72072 Tübingen Germany ...
Страница 31: ...Schmalenberger GmbH Co KG D 72072 Tübingen Germany ...