OPERATING INSTRUCTIONS
52
C2 rondo
Version: 27200 - D
Schmalenberger GmbH + Co. KG
D-72072 Tübingen / Germany
4.4
Installation preparations / Wooden-liner pool
4.5
Pump kit Installation / Concrete-tile pool
fig. 12: Boring diagram
Tailor the installation kit:
Cut the cavity
Ø 260
and the mounting
holes
Ø 12
into the pool wall.
Warning! Risk of damage!
The hold-ring (68) must be used as a
template.
Take note of the asymmetrical position of
the holes!
fig. 13
10
Suction housing
20
Installation kit
26
Nut
27
Distance washer
32
Clamp gasket
Mount the suction housing (10) with the
clamp gasket (32) and the nuts (26) and
washers (27) on the installation kit (20).
The sealing contact faces must be clean
and smooth.
Warning!
The suction housing (10) must be
mounted so that the connection for the
membrane switch is at the top.
8309
8426