Schier SI-75 Скачать руководство пользователя страница 2

Schier | SI-75 Installation Guide

page 2 of 9

Install interceptor as close as possible 
to fixtures being served

SPECIAL PRECAUTIONS

Do not install this unit in any manner 

except as described in these instructions.

Doing so may result in property damage, personal injury or death.

DO NOT AIR TEST UNIT OR RISER SYSTEM!

For Schier Solids Interceptor Installations - Failure to follow this guidance 
voids your warranty

Suspended Installations

Design trapeze to support the wet 
weight of the unit. Do not partially 
support unit or suspend unit using 
metal U-channel to create a trapeze.

concrete floor

Support Inlet and Outlet Piping

For above grade installations ensure 
heavy inlet and outlet piping (such as 
cast iron or long runs) is properly 
supported or suspended during the 
entire installation process to prevent 
connection failure or damage to 
bulkhead fittings. 

pipe supports

Provide at least 16" 
clearance above unit for 
routine maintenance.

16" min.

ODOR ALERT!

Interceptor is not a 
sewer gas trap. 
All upstream fixtures 
must be trapped

ODOR ALERT!

Do not install air 
gap on outlet side 
of interceptor.

Installation Instructions

Installation instructions and additional 
components are included with the 
interceptor. Read all instructions prior to 
installation. This interceptor is intended 
to be installed by a licensed plumber in 
conformance with all local codes.

High Temperature Kitchen Water

cold water supply line

high temperature 
e

uent ( > 150º F)

approved backflow 

prevention assembly

DTV (drain water 

tempering valve)

directly connected

indirectly connected

If water is entering the interceptor at excessive temperature (over 
150º F), a drain water tempering valve (DTV) and approved backflow 
prevention assembly must be installed. Most state and local 
plumbing codes prohibit water above 150º F being discharged into 
the sanitary sewer. Water above 150º F will weaken or deform PVC 
Schedule 40 pipe, poly drainage fixtures like interceptors and erode 
the coating of cast iron (leading to eventual failure).

DO NOT USE CAST IRON 
COVERS IN ABOVE GRADE OR 
INDOOR INSTALLATIONS

Fully Support Base of Unit

Install unit on solid, level surface in 
contact with the entire footprint of 
unit base

Содержание SI-75

Страница 1: ...hierproducts com si 75 Contents Special Precautions 2 3 Getting to Know the SI 75 4 Installation 5 9 INSTALLATION GUIDE SI 75 125 Gallon Billy Goat Indoor Outdoor Kitchen Solids Interceptor 913 951 3300 schierproducts com Copyright 2020 Schier 06 23 2020 ...

Страница 2: ...s trap All upstream fixtures must be trapped ODOR ALERT Do not install air gap on outlet side of interceptor Installation Instructions Installation instructions and additional components are included with the interceptor Read all instructions prior to installation This interceptor is intended to be installed by a licensed plumber in conformance with all local codes High Temperature Kitchen Water c...

Страница 3: ...see figure If it is possible for this to occur install the interceptor and risers in a water tight concrete vault or backfill with concrete or flowable fill wet concrete and flowable backfill should be poured in stages to avoid crushing the interceptor At risk areas include but are not limited to tidal surge areas floodplains and areas that receive storm water Billy Goat models that are direct bur...

Страница 4: ...n gasket 10 Bulkhead connection retaining nut 11 Inlet diffuser 12 Inlet diffuser retaining nut 13 Inlet bulkhead connection 4 FPT 14 4 plain end fitting x2 15 Composite cover bolts and washers x4 16 Bolted composite cover optional 17 Air relief visual access 18 Outlet diffuser retaining nut 19 Outlet diffuser 20 Outlet bulkhead connection standard 4 FPT 21 7 16 nut driver bit 1 15 16 17 18 19 10 ...

Страница 5: ...stics Remove cover For base unit testing fill with water to just above the highest connection Inspect unit connections and gaskets for leaks Check water level at specific time intervals per local code Fill Line Excavate hole at least 12 larger than interceptor on all sides and 6 deeper than tank bottom Lay a level bed of well packed crushed aggregate approximately 3 4 size rock or sand with no fin...

Страница 6: ...outlet connections attached to the diffusers 3a Choose outlet location 3c Cap unused connections all configurations Side Outlet Go to Step 3b Straight Through Go to Step 3c 3b Reposition outlet diffuser side outlets only Remove safety star insert leave tethered to unit Unscrew diffuser retaining nut and remove outlet diffuser Rotate diffuser toward chosen outlet insert into chosen outlet and hand ...

Страница 7: ...on and set level Mechanically couple inlet and outlet drainage lines to unit Do not solvent weld Ensure all upstream fixtures are trapped Vent per local code Installation of 2 way cleanout tees to grade by others is recommended for buried installations Outlet 2 way cleanout tee Inlet BURIED INSTALLATION Kitchen floor Add this vent if unit is installed one or more floors below the fixtures being se...

Страница 8: ...mine riser height needed 6a See instructions included with FCR2 Riser Height Risers Needed Required 0 4 None use adapter 4 34 FCR2 x1 34 64 FCR2 x2 64 94 FCR2 x3 Loosen the cover adapter upper band clamp using 7 16 Nut Driver Bit Adjust cover adapter heights as needed Maintain a minimum 2 1 2 insertion depth Tighten upper band clamp to 5 8 ft lbs of torque using 7 16 nut driver Bit If required cov...

Страница 9: ...chier model AK1 anchor kit Max water table height for direct burial Model AK1 anchor kit Vehicular Traffic Areas Minimum 8 thick concrete slab with rebar required Thickness of concrete around covers to be determined by specifying engineer If traffic loading is required the concrete slab dimensions shown are for guideline purposes only Concrete to be 28 day compressive strength to 4 000 PSI Use No ...

Отзывы: