background image

GB-15

GB-20

GB-25

GB-20 Shown

 16" Max. 

GB-20 Shown

2,500 lb.

Max. load

Riser (sold separately)

Rebar

GB-20 Shown with Riser

2,500 lb.

Max. load

GB-20 Shown

450 lb.

Max. load

NOTES:

Schier grease interceptors are rated and manufactured with an internal flow control system already in 

place.  They do not require an external flow control system or air intake vent.

   

Schier grease interceptors are not to be installed in any other manner except as shown.  Consult local 

codes for separate trapping requirements, cleanout locations and additional installation instructions.

INTERIOR BELOW GRADE INSTALLATION INSTRUCTIONS

(GB-15, GB-20, GB-25)

  

EXCAVATION

Install unit(s) as close as possible to fixtures being serviced.

1.

Width and length of excavation shall be minimum 6" greater 

2.

than the tank on all sides.

Depth of excavation shall be 6" deeper than tank bottom.

3.

Set the tank in well-packed crushed aggregate material 

4.

approximately 3/4" size rock, or sand, with no fines.   

CONNECTIONS

Connect waste piping to the unit.  

1.

BACKFILLING & FINISHED CONCRETE SLAB

Before backfilling and pouring of slab secure cover(s) to the unit(s). 

1.

Backfill using crushed aggregate material approximately 3/4" size rock or sand 

2.

with no fines.

3.   Place 6" aggregate base under slab.

INTERIOR ABOVE GRADE INSTALLATION INSTRUCTIONS

(GB-15, GB-20 GB-25)

If concrete slab falls within body of unit, reinforce with rebar,

extending 6" beyond footprint of unit to connect main floor slab.

When the jobsite requires burying unit flush with floor without using

a riser kit, maximum cover/unit top load rating is 450 lbs.

Concrete

Crushed aggregate or sand backfill

Native soil

CONNECTIONS

Install unit as close as possible to fixture(s) being served.

1.

Connect waste piping to the unit.  

2.

DATE: 

11/1/10

GREAT BASIN INSTALLATION, OPERATION 

AND MAINTENANCE GUIDE

Schier Products

9500 Woodend Rd

Edwardsville, KS 66111

Tel: 800-827-7119

Fax: 800-827-9664

www.schierproducts.com

Made in the U.S.A

DESCRIPTION:  

DWG BY: 

TEU

REV: 

3 - 11/07/11

SHEET NUMBER: 

4 of 7

MATL: 

PE

 

THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF 

SCHIER PRODUCTS

. ANY REPRODUCTION IN 

PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF 

SCHIER PRODUCTS 

IS PROHIBITED.

PROPRIETARY AND CONFIDENTIAL

Содержание GB-15

Страница 1: ...oducts were originally installed and will at its option agree to repair replace or supply credit to the original purchaser This warranty does not cover damage caused by the Products normal usage or wear and tear nor does it cover damage from naturally occurring phenomenon including but not limited to UV freeze related damage or natural disasters This warranty does not cover the purchaser s cost of...

Страница 2: ...y hand loosening green locking collars b 6 connections Remove threaded clean out plug from the back of the inlet and outlet diffusers Clean the drain lines diffusers and air relief thoroughly of all debris before replacing diffusers to 4 original positions or reinstalling threaded clean out plug Run sinks to fill unit s with water 5 Inspect gasket for wear and tear Replace cover s 6 Dispose of gre...

Страница 3: ...ons BELOW GRADE INSTALLATION INSTRUCTIONS EXCAVATION Install unit s as close as possible to fixtures being serviced 1 Width and length of excavation shall be minimum 12 greater 2 than the tank on all sides Depth of excavation shall be 6 deeper than tank bottom 3 Set the tank in well packed crushed aggregate material 4 approximately 3 4 size rock or sand with no fines When setting GB 75 2 GB 250 2 ...

Страница 4: ...FILLING FINISHED CONCRETE SLAB Before backfilling and pouring of slab secure cover s to the unit s 1 Backfill using crushed aggregate material approximately 3 4 size rock or sand 2 with no fines 3 Place 6 aggregate base under slab INTERIOR ABOVE GRADE INSTALLATION INSTRUCTIONS GB 15 GB 20 GB 25 If concrete slab falls within body of unit reinforce with rebar extending 6 beyond footprint of unit to ...

Страница 5: ...s follow installation instructions outlined in installation packet Units must be piped as shown above to ensure that the units work properly as the system is designed The units must be equally spaced to ensure the equal distribution of effluent flow For systems that are installed below grade it is recommended to install a two way clean out tee extended to finished grade before and after each unit ...

Страница 6: ...led into the main unit this new line will end up at the top of the gasket and will aid in re assembly See Figure 3 IMPORTANT Before the next step 8 Make sure both diffusers are installed inside the main unit at the appropriate locations 1 and check if there needs to be any flow control adjustment on the inlet diffuser Refer to sheet 2 of the installation instructions for flow control adjustment Re...

Страница 7: ...p edge of the riser down to the finished floor Make sure to account for any future tile work 5 in your measurment See Figure 2 Remove riser from ring Take measurement from step 5 from the BOTTOM of the riser upwards towards the top of the 6 riser Mark a line around the riser and cut with handsaw jig saw or reciprocating saw Remove debris from cut edge with scraper utility knife or gloves See Figur...

Отзывы: