background image

Set unit on level solid surface as close as

possible to fixtures being served.  If unit is 

to be installed below grade refer to below 

grade installation instructions. (sheet #3)

Isometric View

FLOW

FLOW

A

B

C

Connect outlet diffuser to the desired 

outlet (A,B,C).  Unit is shipped with outlet 

diffuser in location B and sealing caps on

locations A and C.

Top View

(Inside Unit)

Connect inlet and outlet drainage lines to 

unit.  Mechanically couple pipes to

unit. 

Do not solvent weld

.  If connecting 

multiple units for an engineered grease 

interceptor system refer to multiple unit 

installation sheet. (sheet #5)

Top View

To maintain proper flow rate, 

when interceptor is installed in 

a low flow or reduced head 

pressure application remove 

and discard calibrated flow

plate.  Flow plate orifice 

calibrated to rated flow (GPM) at 

13 foot water column.

Flow Plate

To maintain proper flow rate, 

when interceptor is installed

in a high flow or increased head

pressure application keep 

calibrated flow plate installed.

Flow plate orifice calibrated to 

rated flow (GPM) at 13 foot water

column.

Flow Plate

Inlet diffuser

Cover

Adapter

Locking collar

Air relief

Optional outlet

Locking collar

Flow

Outlet diffuser

GB-250 Shown

Flow

GB-250 Shown

Fill with water

NOTES:

Schier grease interceptors are rated and manufactured with an internal flow control system already in 

place.  They do not require an external flow control system or air intake vent.

Schier grease interceptors are not to be installed in any other manner except as shown.  Consult local 

codes for separate trapping requirements, cleanout locations and additional installation instructions.

MAINTENANCE

Remove cover(s).

1.

  

Remove all contents of the grease interceptor including grease, sediment and wastewater.  For most 

2.

thorough cleaning contact a professional pumper contractor.

 

To access the inlet and outlet lines for cleaning as needed:

3.

a.) 4" connections:  Remove the inlet and outlet diffusers (inside unit(s)) by hand loosening

      green locking collars.

b.) 6" connections:  Remove threaded clean-out plug from the back

  

of the inlet and outlet diffusers.

  

Clean the drain lines, diffusers and air relief thoroughly of all debris before replacing diffusers to 

4.

original positions or reinstalling threaded clean-out plug.

 

Run sinks to fill unit(s) with water.

5.

  

Inspect gasket for wear and tear. Replace cover(s).

6.

  

Dispose of grease per local code.

7.

PUMPING FREQUENCY:

Frequency depends on the capacity of the interceptor and the amount of grease and sediment in the 

wastewater.

Monitor each pumping to establish an adequate maintenance schedule based off actual kitchen variances.  

Levels can be tested with core sampler. Schier Products recommends pumping frequency to exceed no more 

than 90 days.

OPERATION

Schier Products offers a complete line of grease interceptor tanks to separate fats, oils, and grease waste 

from the waste stream and stops it entering the public sewer system.

Influent passes through the built-in calbrated flow control, where it is diffused into the main chamber. Lighter 

grease is forced upward, heavier solids are forced downward. Effluent flows through the outlet, free of 

grease and food waste.

Flow

GENERAL INTERCEPTOR INSTALLATION INSTRUCTIONS

(GB-250 SHOWN)

To test unit and TeleGlide riser system for leaks, cap/plug connections and fill unit 

with water to covers.  Inspect gaskets, fittings, and unit for any leaks.

If no leaks are detected drain water to the static waterline. Unit is now ready to be 

backfilled and put into operation. 

TROUBLESHOOTING TIPS:

In the case of a clog, inlet and outlet diffusers may be removed for line cleaning.  Slower than usual sink 

drainage may indicate the need to pump/clean grease interceptor.

Always take proper care to ensure a safe and healthy environment while cleaning interceptor.  For best 

cleaning and maintenance service, call your local sewer and drain contractor.

DATE:  

11/1/10

REV: 

3 - 11/07/11

GREAT BASIN INSTALLATION, OPERATION 

AND MAINTENANCE GUIDE

Schier Products

9500 Woodend Rd

Edwardsville, KS 66111

Tel: 800-827-7119

Fax: 800-827-9664

www.schierproducts.com

Made in the U.S.A

DESCRIPTION:  

DWG BY: 

TEU

SHEET NUMBER: 

2 of 7

MATL: 

PE

THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF 

SCHIER PRODUCTS

. ANY REPRODUCTION IN 

PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF 

SCHIER PRODUCTS 

IS PROHIBITED.

PROPRIETARY AND CONFIDENTIAL

Содержание GB-15

Страница 1: ...oducts were originally installed and will at its option agree to repair replace or supply credit to the original purchaser This warranty does not cover damage caused by the Products normal usage or wear and tear nor does it cover damage from naturally occurring phenomenon including but not limited to UV freeze related damage or natural disasters This warranty does not cover the purchaser s cost of...

Страница 2: ...y hand loosening green locking collars b 6 connections Remove threaded clean out plug from the back of the inlet and outlet diffusers Clean the drain lines diffusers and air relief thoroughly of all debris before replacing diffusers to 4 original positions or reinstalling threaded clean out plug Run sinks to fill unit s with water 5 Inspect gasket for wear and tear Replace cover s 6 Dispose of gre...

Страница 3: ...ons BELOW GRADE INSTALLATION INSTRUCTIONS EXCAVATION Install unit s as close as possible to fixtures being serviced 1 Width and length of excavation shall be minimum 12 greater 2 than the tank on all sides Depth of excavation shall be 6 deeper than tank bottom 3 Set the tank in well packed crushed aggregate material 4 approximately 3 4 size rock or sand with no fines When setting GB 75 2 GB 250 2 ...

Страница 4: ...FILLING FINISHED CONCRETE SLAB Before backfilling and pouring of slab secure cover s to the unit s 1 Backfill using crushed aggregate material approximately 3 4 size rock or sand 2 with no fines 3 Place 6 aggregate base under slab INTERIOR ABOVE GRADE INSTALLATION INSTRUCTIONS GB 15 GB 20 GB 25 If concrete slab falls within body of unit reinforce with rebar extending 6 beyond footprint of unit to ...

Страница 5: ...s follow installation instructions outlined in installation packet Units must be piped as shown above to ensure that the units work properly as the system is designed The units must be equally spaced to ensure the equal distribution of effluent flow For systems that are installed below grade it is recommended to install a two way clean out tee extended to finished grade before and after each unit ...

Страница 6: ...led into the main unit this new line will end up at the top of the gasket and will aid in re assembly See Figure 3 IMPORTANT Before the next step 8 Make sure both diffusers are installed inside the main unit at the appropriate locations 1 and check if there needs to be any flow control adjustment on the inlet diffuser Refer to sheet 2 of the installation instructions for flow control adjustment Re...

Страница 7: ...p edge of the riser down to the finished floor Make sure to account for any future tile work 5 in your measurment See Figure 2 Remove riser from ring Take measurement from step 5 from the BOTTOM of the riser upwards towards the top of the 6 riser Mark a line around the riser and cut with handsaw jig saw or reciprocating saw Remove debris from cut edge with scraper utility knife or gloves See Figur...