background image

ScentWave™ SWD1001

SCENT DELIVERY SYSTEM 

Installation and Operation Instructions

Содержание ScentWave SWD1001

Страница 1: ...ScentWave SWD1001 SCENT DELIVERY SYSTEM Installation and Operation Instructions...

Страница 2: ...environment It uses a dry air technology that releases fragrance without sprays aerosols or messy oils Adjustable duration and intensity settings and built in 24 hour timer make it easy to customize...

Страница 3: ...and hardware for each Mount the ScentWave in a discrete location out of the reach of children A good rule of thumb is to mount low to the ground when possible 1 Main Entrance 2 3 Secondary Entrance D...

Страница 4: ...the anchors leaving 25 7 5mm between the top of the screw and the wall FIG A 2 Attach the Mounting Arm to the ScentWave FIG B Attach the mounting plate to the bottom of the ScentWave using the provide...

Страница 5: ...wall mounting bracket through the center hole using the provided lock nut and screw Attach the mounting plate assembly to the bottom of the ScentWave using the provided plate screws and pilot holes 3...

Страница 6: ...t cartridge cord into the connection on the inside bottom front of the ScentWave FIG G 4 Insert the scent cartridge completely into the ScentWave by lining up the notches on the cartridge with the ope...

Страница 7: ...vailable power source and that a scent cartridge is inserted into the machine 2 Set the MASTER POWER to TIMER Set the TIME OF DAY Press SET until AM PM begins to flash Use to adjust the system to the...

Страница 8: ...For further assistance please contact Client Relations at 866 723 6824 clientrelations scentair com...

Отзывы: