Fuel system
OPM 320 en-GB
50
©
Scania CV AB 2019, Sweden
3.
Adjust the pressure regulator so that the ma-
nometer shows 7 psi.
4.
Lock the pressure regulator adjustment rota-
ry control and close the valve.
Leak testing the intake system up-
stream of the throttle
1.
Undo the hose clamps.
2.
Turn the charge air pipe downwards.
3.
Close the nipple on pressure cap 2 655 714
and fit the cover to the hose spigot.
4.
Tighten the hose clamps.
10
0
20
30
40 50 60
70
80
90
100
389 39
0
38
9
38
9