Hardware manual PCD7.LRxx-PG5 room controller │ Document 27-653; version ENG07 │ 2019-03-21
Saia-Burgess Controls AG
Programming
General guidance
2-18
2
2.10 Programming
The PCD7.LRxx-P5 room controllers are programmed with Saia PG5
®
directly over
Micro-USB or over an S-Bus Master Gateway controller via S-Bus.
Programming directly via USB
PCD7.LRxx-P5 room controllers have a Mi-
cro-USB port on the front.
By directly connecting the PC to the module via
the USB port, the user program can be loaded
on to the connected room controller, for exam-
ple, or a firmware update can be carried out.
USB
AO0…
GND
0-10V
V
UI0…
0-10V
GND
Dig.
NTC
V
RS485 / Port 0
/D A +
D B -
RO3 IN3 RN RN IN0 RO0 IN1 RO1 IN2 RO2
TN T~ TO0 TN TO1
RUN/HALT
Power Supply
---
230 V In
24 VAC In
24 VAC Out
Sylk Bus
RS485 / Port 1
USB
T1 R1 T0 R0 !
1
L
2
N
3
24V~
4
24V0
5
TN
6
T~
7
TO0
8
TN
9
TO1
10
RO3
11
IN3
12
RN
13
RN
14
IN0
15
RO0
16
IN1
17
RO1
18
IN2
19
RO2
AO0
26
24V~
27
GND
28
AO1
29
AO2
30
24V~
31
UI0
34
GND
35
UI1
36
/DA+
40
DB-
41
GND
42
UI2
37
GND
38
UI3
39
GND
32
AO3
33
WM1
20
WM2
21
24V~
22
/DA+
23
DB-
24
GND
25
3
4
5
6
7
8
9
10 11 12 13 14 15 16 17 18 19
40 41 42
26 27 28 29 30 31 32 33
34 35 36 37 38 39
20 21 22
23 24 25
PG5
Programming using a
master controller (PCDx.Mxxxx)
The master controller, which is connected to
the freely programmable room controllers,
uses the RS-485 bus (S-Bus) to load the user
program or a firmware update, for example,
on to the corresponding room controllers. The
master controller is used as a gateway in this
case.
PG5
RS-485
PCD
controller
AO0…
GND
0-10V
V
UI0…
0-10V
GND
Dig.
NTC
V
RS485 / Port 0
/D A +
D B -
RO3 IN3 RN RN IN0 RO0 IN1 RO1 IN2 RO2
TN T~ TO0 TN TO1
RUN/HALT
Power Supply
---
230 V In
24 VAC In
24 VAC Out
Sylk Bus
RS485 / Port 1
USB
T1 R1 T0 R0 !
1
L
2
N
3
24V~
4
24V0
5
TN
6
T~
7
TO0
8
TN
9
TO1
10
RO3
11
IN3
12
RN
13
RN
14
IN0
15
RO0
16
IN1
17
RO1
18
IN2
19
RO2
AO0
26
24V~
27
GND
28
AO1
29
AO2
30
24V~
31
UI0
34
GND
35
UI1
36
/DA+
40
DB-
41
GND
42
UI2
37
GND
38
UI3
39
GND
32
AO3
33
WM1
20
WM2
21
24V~
22
/DA+
23
DB-
24
GND
25
3
4
5
6
7
8
9
10 11 12 13 14 15 16 17 18 19
40 41 42
26 27 28 29 30 31 32 33
34 35 36 37 38 39
20 21 22
23 24 25
The room controllers are project-engineered with Saia PG5
®
using FBoxes or IL.
There is a selection of FBoxes available for this purpose, which makes engineer-
ing easier.
List of supported libraries:
Binary
Blinker
Block Control (no SB)
Buffers
Com.Text (not interpreted)
Converter
Counter
DALI E-Line Driver (new)
Data Block
Data Buffer
EnOcean (partial)
Flip-Flop
Floating Point (IEEE only)
HVC (partial)
Indirect
Integer
Ladder
Move In/Out
Modbus (E-Suite)
Regulation (partial)
Special, Sys Info (partial)
Timer
In addition to these libraries, a new library
“E-Suite V2” is available for specific applica
-
tions that can be implemented using the Saia
PCD1 E-Line modules.
For electrical building services, for example:
blind control, dimming of lighting, etc.
Out blind
- En
Err-
Sync
Busy-
Set
Up-
-
Pos
Down-
-
IUp
LastCmd-
-
IDown
-
Cmd0
In PushButton 1
- En
Cmd-
In
LastCmd-
Compared to a PCDx.Msss controller, not all functions are available. For example,
these modules do not have an automation server and the resources are limited
(see section 3.5 “System resources”).
To support the PCD7.LRxx-P5 room controllers with E-Line devices, the library
E-Line V1.3 or higher must be installed on the PG5.
The required PCD, IRM and E-Line firmware is described in the aforementioned
help library V1.3 or higher.