EN
8
8
INSTALLATION
Drilling the Wall
373
105
150 150
12a
Mark the following on the wall:
• a vertical line up to the ceiling or surface above the hood, at the centre of the area in which
the hood itself is to be fitted;
• a horizontal line at: 650 mm min. above the Hob;
• Rest the Bracket
7.2.1
as indicated, 1-2 mm from the ceiling or surface above the hood,
aligning its centre (grooves) with the vertical reference line.
• Mark the centres of the holes in the bracket.
• Rest the Bracket
7.2.1
as indicated, X mm under the first bracket (X = height of the Upper
chimney provided), aligning its centre (grooves) with the vertical reference line.
• Mark the centres of the holes in the bracket.
• Mark a reference point as indicated at 105 mm from the horizontal reference line.
• Drill the points marked using an ø 8 mm bit.
• Insert the plugs
11
into the holes.
• Fix the Brackets, using the screws
12a
(4.2 x 44.4) provided.
• As indicated above, mark a reference point 373 mm above the horizontal reference line, and
150 mm to the right of the vertical reference line.
• Repeat this operation on the opposite side, checking to ensure it is level.
• Drill the points marked using an ø 12 mm bit.
• Insert the plugs, screws and bracket
11a
into the holes, and fasten.
Содержание NOPPA
Страница 1: ...NOPPA Instructions Manual K ytt ohje...
Страница 23: ......
Страница 24: ...991 0582 438_ver2 191023 D00005812_01...