Savaria M2LIFT Скачать руководство пользователя страница 12

12

 

5. MAINTENANCE

 

NOTE

 

Regular

 

maintenance

 

(performed

 

by

 

your

 

Authorized

 

Savaria

 

Dealer)

 

will

 

keep

 

your

 

unit

 

in

 

proper

 

operating

 

condition.

 

As

 

the

 

owner

 

of

 

this

 

unit,

 

you

 

are

 

responsible

 

for

 

making

 

sure

 

that

 

maintenance

 

and

 

upkeep

 

are

 

done

 

on

 

a

 

regularly

 

scheduled

 

basis.

 

To

 

ensure

 

proper

 

operating

 

condition

 

of

 

your

 

unit,

 

the

 

items

 

listed

 

below

 

must

 

be

 

performed

 

every

 

6

 

months

 

by

 

an

 

Authorized

 

Savaria

 

Dealer.

 

Additional

 

inspections

 

may

 

be

 

required

 

depending

 

on

 

usage.

 

Units

 

installed

 

in

 

adverse

 

environments

 

will

 

require

 

additional

 

maintenance

 

on

 

a

 

monthly

 

basis..

 

DANGER

 

Technicians

 

must

 

always

 

ensure

 

the

 

lift

 

is

 

safely

 

shored

 

when

 

working

 

under

 

the

 

platform.

 

Maintenance Schedule 

Verification

 

Frequency

 

Verify

 

general

 

operation

 

of

 

the

 

lift.

 

Every

 

2

 

months

 

Verify

 

correct

 

operation

 

of

 

the

 

underpan

 

sensors.

 

Every

 

2

 

months

 

Verify

 

correct

 

operation

 

of

 

the

 

emergency

 

stop.

 

Every

 

2

 

months

 

Verify

 

correct

 

operation

 

of

 

the

 

gate

 

lock

 

contacts.

 

The

 

lift

 

should

 

not

 

run

 

unless

 

the

 

gate

 

is

 

closed

 

and

 

locked.

 

Every

 

2

 

months

 

Verify

 

the

 

general

 

operation

 

of

 

the

 

lift.

 

Every

 

6

 

months

 

Check

 

the

 

chains

 

in

 

the

 

suspension

 

system.

 

Every

 

6

 

months

 

Check

 

the

 

connecting

 

links

 

in

 

the

 

suspension

 

system.

 

Every

 

6

 

months

 

Check

 

the

 

chain

 

pulleys

 

and

 

shafts

 

in

 

the

 

suspension

 

system.

 

Every

 

6

 

months

 

Check

 

the

 

parts

 

holding

 

the

 

chains

 

on

 

the

 

roller

 

supports

 

in

 

the

 

suspension

 

system.

 

Every

 

6

 

months

 

M2LIFT

 

Owner’s

 

Manual

 

Part

 

No.

 

001103,

 

10-m08-2021

 

Содержание M2LIFT

Страница 1: ...M2Lift Vertical Platform Lift Owner s Manual ...

Страница 2: ...nce schedule Refer to this owner s manual for unit description setup operating instructions and a maintenance schedule for your Lift Upon completion of installation the Savaria mechanic must provide you with the information for the box below and ensure it is recorded in this owner s manual In addition either you or the Savaria mechanic must keep any service and or maintenance records in the Mainte...

Страница 3: ...RIPTION 5 2 GENERAL SPECIFICATIONS 6 3 OPERATION 7 Attendant Operation 7 Operating from the COP Controls 7 Operating from the Landing Station Controls 8 4 ADDITIONAL FEATURES 10 Safety Underpan 10 Gate Lock 11 Safety Brake 11 Emergency Stop Button 11 Battery Lowering 11 5 MAINTENANCE 12 Maintenance Schedule 12 Operator Troubleshooting 14 Maintenance Record 15 Part No 001103 10 m08 2021 M2LIFT Owne...

Страница 4: ...d personnelperform maintenanceand service on the unit When replacing parts be surethat only genuine Savaria parts are used This unit is intended for use by a mature person who understands its proper operation as set out in this manual WARNING At no time shouldchildren underthe age of 16 use the lift while unsupervised Prior to operation make sure that All doors and gates are locked and secure All ...

Страница 5: ...LIFT Figure 1 Car operating Tower rail cap panel COP Landing gate COP side wall Tower Landing sill Opposite side wall Access ramp Fascia Non skid platform panel Motor cover Pit switch Safety underpan Base support legs Part No 001103 10 m08 2021 M2LIFT Owner s Manual ...

Страница 6: ... phase Drive system Direct drive gear Chain suspension Motor 24 VDC 1 3 HP geared Controller LUT125 PCB Finish Electrostatic powder coat paint on all metallic surfaces and vacuumed formed plastics Standard features 24VDC operation Wireless call send stations at landings Constant pressure type buttons Operating control buttons on platform Automatic battery recharging system 115 VAC Low voltage cont...

Страница 7: ...if the lift is unenclosed The attendant shall have full view of the floor area under the lift and of the rider at all times If the lift is enclosed the lift can be operated from the upper landing provided the operator has a view of the rider at all times During attendant operation the car directional controls must not be operational Operating from the COP Controls Figure 2 shows the car operating ...

Страница 8: ... the unit is not in operation 5 Pressing the Emergency Stop button during travel will stop the lift immediately and activate the alarm The Emergency Stop overrides the landing station controls Pull the Emergency Stop out to return the lift to normal operation 6 If the gate is locked at a landing for more than 10 seconds you can press the Up button to unlock the gate Operating from the Landing Stat...

Страница 9: ... open 3 When the lift reaches the landing the door will unlock automatically If you need to re open the door after the delay turn the key on and press the call Up button again to unlock the door 4 To prevent unauthorized useof the lift takethe key outwhen the unit is not in operation Part No 001103 10 m08 2021 M2LIFT Owner s Manual ...

Страница 10: ... Figure 4 is located under the platform The underpan has sensors that detect any obstacles and stop the downward travel of the lift This is optional on enclosed units and required on open hoistways Figure 4 Safety Underpan M2LIFT Owner s Manual Part No 001103 10 m08 2021 ...

Страница 11: ...ey a half turn counter clockwise to remove it from the lock DO NOT open the gate if there is any chance of falling from the platform Safety Brake EY 0 The motor Safety Brake stops the platform in the event of a chain failure During normal operation the chain tension keeps the brake mechanism up so the brake cam does not interfere with the tower guide rail If a chain failure occurs the brake mechan...

Страница 12: ...ft is safely shored when working under the platform Maintenance Schedule Verification Frequency Verify general operation of the lift Every 2 months Verify correct operation of the underpan sensors Every 2 months Verify correct operation of the emergency stop Every 2 months Verify correct operation of the gate lock contacts The lift should not run unless the gate is closed and locked Every 2 months...

Страница 13: ...stem The tensioners must be tight Every 6 months Verify that all hardware is tightened Every 6 months Check the safety brake Every 6 months Check the rollers function and wear Every 6 months Ensure that all filler panels are securely fastened in the gate Every 6 months Part No 001103 10 m08 2021 M2LIFT Owner s Manual ...

Страница 14: ...he pan is not stuck in the activated position Platform comes down but does not go up Check that the power cord is plugged in Platform does not move Check that the key is ON Check that the gate is closed Check to see if the Emergency Stop buttons on the COP and tower are pushed in they must be pulled out for normal operation If the platform is at the top landing check the underpan sensors as descri...

Страница 15: ...Maintenance Record Date Time Reason for call Comments Dealer ...

Страница 16: ... service or questions about this product please contact your installing dealer Dealer Name Dealer Phone Authorized Savaria Dealer Savaria Concord Lifts Inc 2 Walker Drive Brampton ON L6T 5E1 Canada savaria com Part No 001103 2021 Savaria Corporation ...

Отзывы: