
Page 32 of 57
Vertical Installations
Always maintain a 1” clearance around the vent pipe (vertical) and 1” clearance horizontal, when passing
through ceilings, walls, roofs, enclosures, attic rafter or any combustible surfaces.
NOTE
DO NOT PACK AIR SPACES WITH INSULATION
NE PAS PACK ESPACES D'AIR AVEC ISOLATION
When passing through a flat ceiling
install a Box/Wall thimble. Cut a 9” square hole and frame as shown in
the diagram below.
NOTE
ALWAYS CHECK YOUR LOCAL CODES BEFORE INSTALLING VENTING. CLEARANCES ETC,
MAY VARY FROM STATE TO STATE (PROVINCE TO PROVINCE).
TOUJOURS vérifier les codes locaux avant l'installation VENTILATION. ETC DÉGAGEMENTS, peut
varier d'ÉTAT (PROVINCE).
NOTE
CONSULT DURAVENT PARTS LIST OR INC
A METAL CUTTING’S FIREPLACE MANUFACTURING
PARTS LIST FOR PART NUMBERS.
FOYER Duravent CONSULT LISTE DES PIÈCES OU COUPE METAL INCA de fabrication LISTE
DES PIÈCES DE RÉFÉRENCE.
See section 3.3.4 Venting for instructions on how to connect Security or Dura-vent
venting.
9” x 9” opening
Содержание BL21
Страница 28: ...Page 28 of 57 34 20 A A B B Example Where A A Vertical 2 And B B Horizontal 5 12 Minimum 24 Maximum...
Страница 50: ...Page 50 of 57 8 0 LABEL INFORMATION...
Страница 52: ...Page 52 of 57 APPENDIX A AMERICAN FLAME VALVE INFORMATION...
Страница 53: ...Page 53 of 57 APPENDIX A Continued...