
Page 35 of 68
Vertical Installations
Always maintain a 1” clearance around the vent pipe (vertical) and 1” clearance horizontal, when passing
through ceilings, walls, roofs, enclosures, attic rafter or any combustible surfaces.
NO
T
E
DO NOT PACK AIR SPACES WITH INSULATION
NE PAS PACK ESPACES D'AIR AVEC ISOLATION
When passing through a flat ceiling
install a Box/Wall thimble. Cut a 9” square hole and frame as shown in
the diagram below.
NO
T
E
ALWAYS CHECK YOUR LOCAL CODES BEFORE INSTALLING VENTING. CLEARANCES ETC,
MAY VARY FROM STATE TO STATE (PROVINCE TO PROVINCE).
TOUJOURS vérifier les codes locaux avant l'installation VENTILATION. ETC DÉGAGEMENTS, peut
varier d'ÉTAT (PROVINCE).
NO
T
E
CONSULT DURAVENT PARTS LIST OR INCA METAL CUTTING’S FIREPLACE MANUFACTURING
PARTS LIST FOR PART NUMBERS.
FOYER Duravent CONSULT LISTE DES PIÈCES OU COUPE METAL INCA de fabrication LISTE
DES PIÈCES DE RÉFÉRENCE.
See section 3.3.4 Venting for instructions on how to connect Security or Dura-vent
venting.
9” x 9” opening
Содержание BCF36
Страница 18: ...Page 18 of 68 Figure 2...
Страница 31: ...Page 31 of 68 34 20 A A B B Example Where A A Vertical 2 And B B Horizontal 5 12 MINIMUM 12 MAXIMUM...
Страница 61: ...Page 61 of 68 8 0 LABEL INFORMATION...
Страница 63: ...Page 63 of 68 APPENDIX A AMERICAN FLAME VALVE INFORMATION...
Страница 64: ...Page 64 of 68 APPENDIX A Continued...