10
COMMISSIONING & LIGHTING - OPALIS 5
Diagram 7
Commissionning
●
With the front casing removed, fit the tempera-
ture selector knob where applicable.
●
On tap models, fit the hot tap handle (red) to the
left hand spindle and the cold tap handle (blue) to
the right hand spindle.
●
Open all remote hot taps and, on tap models,
open the hot tap on the front of the heater.
●
Open the water service cock.
●
When all the air has been removed from the
system, close the taps and check all joints for water
soundness.
Lighting
For your convenience, this appliance has been
fitted with a rapid-vent starter pilot. This will prevent
having to press the button for a long time at start-
up or after long stoppage.
●
Turn control lever (
2 diagram 7
) to align red flame
(
a
) with mark (
b
) on front panel (
diagram 8.1
).
OPALIS 5
5
3
2
4
6
D
1
Des 060
Description
1 -
Pilot tube
2 -
Control knob
3 -
Temperature selector
4 -
Drain plug
5 -
Base pilot injector (not visible)
6 -
Vent pilot injector
D -
Piezo unit
Mec 041a
b
a
Diagram 8.1
Diagram 8.2
Mec 041a
c
●
Push button (
c
)(
diagram 8.2
) right down and
hold ; air contained in the pipes is discharged by
vent pilot. The gas cannot reach the burner.
●
Push piezo-unit button (
D diagram 7
), and starter
pilot ignites followed by safety pilot.
●
Wait approximately 15 seconds for the thermo-
couple to heat up, then release button (
c
) to
return ; appliance is then ready for operation.
●
To turn off the appliance, turn control lever to
align white circle (
d
) with mark (
b
) on front panel
(
diagram 8.3
).
Diagram 8.3
Mec 041a
b
d
Содержание OPALIS 5
Страница 16: ...16 104560 B 07 96...