Satec PM135 Скачать руководство пользователя страница 4

PM135 QuickStart 

 

www.satec-global.com 

CONFIGURATION 

The essential configuration includes: 

1.

 

Basic measurement setup 

2.

 

Communication setup and testing 

3.

 

Resetting the min/max, energy, demands etc. 

Additional recommended configuration: set points, TOU and data logging 
Note: It may be easier to configure communication first and use PAS software for setup 

Basic Measurement Setup 

In any display screen, press 

MENU

  

 

 

   to enter the Basic Settings Display.  

Parameter 

Description 

Default 

Wiring Mode (see below)  

Network wiring configuration 

4LN3 

PT Ratio 

Transformation ratio of the Potential Transformers 

PT Ratio Multiplier 

Additional PT factor for EHV network 

X1 

CT Primary Current 

The Primary Rating Of The Current Transformers 

5A 

Power Demand Period 
(E & EH models) 

Duration in minutes of the power demand period 
calculations. E = External pulse in DI1. 

15 

Blocks in Sliding Demand 
(E & EH models) 

The number of blocks to be averaged for sliding window 
demands 

Volt/Ampere Demand Period 

Duration in seconds for voltage and current demand 

900 

Nominal Frequency 

The nominal frequency 

60 Hz 

Max. Demand Load Current 

0 = CT primary current. Other = max. current 

 

Wiring Mode 

Setup 

3-wire 2-element Delta direct connection using 2 CTs 

3DIR2 

4-wire 3-element Wye direct connection or 3PTs, and 3 CTs 

4LN3 or 4LL3

*

 

3-wire 2-element Open Delta connection using 2 PTs, 2 CTs 

3OP2 

4-wire 2½-element Wye connection using 2 PTs, 3 CTs 

3LN3 or 3LL3

*

 

3-wire 2½-element Open Delta connection using 2 PTs, 3 CTs 

3OP3 

4-wire 3-element Delta direct connection using 3 CTs 

4LN3 or 4LL3

*

 

3-wire 2½-element Broken Delta connection using 2 PTs, 3 CTs  

3bLN3 or 3bLL3

*

 

* LN or LL denotes the default use of L-L or L-N voltages (in thresholds, min/max, demands etc.) 

Communication setup and testing 

In any display screen, press

 MENU

 

 

  

 5 times 

 

and

 

  to setup the built in RS-485 port 

(COM1). If communication module is present, configure also COM2. 

Resetting the min/max, energy, demands etc. 

Press

 MENU

 

 

 

  

 

  to enter the reset menu. Select the value to be reset, press 

  

 to 

select, then press 

 

  for 5 seconds until the "Do" notification is changed to "Done". 

 

 

 
 

 
 

Copyright © 2013 SATEC Ltd. 

For a Chance to Win a Tablet Register Your Product Here: 
www.satec-global.com/register 

 

WIN!

 

Содержание PM135

Страница 1: ...135 shall be made in accordance with all applicable laws and or regulations and be performed by authorized personnel only MOUNTING Position the PM135 meter in 92 92mm square or 4 round cutout Figure 1 If two PM135 are positioned side by side keep at least 150mm 5 9 between their centers to allow installation of add on modules 140mm 5 5 if only small form modules will be used Attach the PM135 unit ...

Страница 2: ...ernal CT ends with two wires Note 2B 5 1 Pass one wire through the meter CT core 5 2 Connect the wire to one of the meter optional CT wire termination screws 5 3 Connect the second wire from the external CT to the termination screw 6 Connect the measured voltage inputs 7 Connect COM1 RS 485 communication port 8 To connect the optional module 8 1 Make sure that the power is turned off 8 2 Remove th...

Страница 3: ...reens Group to change Screens to go right to go left Underlined included in Auto Scroll Voltages V L L V L N THD Ue Hz Phase Demand Currents Amps THD TDD K Factor Unbalance Demand Powers Total L1 L2 L3 Import Demand Export Demand Demands P Import P Export Amps Volts Min Max V L L V L N Amps I neutral P PF Hz Energy Import Export TOU Import Export Reg 1 Reg 2 Harmonics 3 5 7 39 Spectrum V1 V2 V3 I1...

Страница 4: ...for voltage and current demand 900 Nominal Frequency The nominal frequency 60 Hz Max Demand Load Current 0 CT primary current Other max current 0 Wiring Mode Setup 3 wire 2 element Delta direct connection using 2 CTs 3DIR2 4 wire 3 element Wye direct connection or 3PTs and 3 CTs 4LN3 or 4LL3 3 wire 2 element Open Delta connection using 2 PTs 2 CTs 3OP2 4 wire 2 element Wye connection using 2 PTs 3...

Отзывы: