PM135 QuickStart 

 

www.satec-global.com 

CONNECTION 

To connect follow these steps (Figure 2 shows a 4W LV installation with conventional CTs): 

1.

 

Ensure that all incoming power sources are OFF. 

2.

 

Check that you have the appropriate power supply. 

3.

 

Connect the Power Supply inputs using 1.5 mm²/14AWG dedicated wires and breaker. 

4.

 

Connect to the external CTs by passing the external CTs wires through the meter CT cores. 
Observe the arrow that indicates the current direction (Figure 2A). For HACS: connect the 
red or white wire to the “-” and orange or black wire to the “+“ terminal. 

5.

 

In case of a retrofit application where each external CT ends with two wires (Note 2B): 
5.1.

 

Pass one wire through the meter CT core. 

5.2.

 

Connect the wire to one of the meter “optional CT wire termination” screws. 

5.3.

 

Connect the second wire from the external CT to the termination screw. 

6.

 

Connect the measured voltage inputs 

7.

 

Connect COM1 – RS-485 communication port 

8.

 

To connect the optional module: 
8.1.

 

Make sure that the power is turned off 

8.2.

 

Remove the module cover 

8.3.

 

Attach the module and fasten the screws 

8.4.

 

Connect the module I/O or communication (see Figure 2C for DI/O wiring) 

9.

 

Turn the power up 

10.

 

Make sure the diagnostic led is off and solid “123” phase indication is displayed 

 

 

 

 

The “optional CT wire termination” 
allows connection of the two wires 
from the CTs. They have no internal 
connection and their use is optional.  

Figure 2 

Note 
2B 

Figure

 2A 

Figure 2C 

Содержание PM135

Страница 1: ...135 shall be made in accordance with all applicable laws and or regulations and be performed by authorized personnel only MOUNTING Position the PM135 meter in 92 92mm square or 4 round cutout Figure 1 If two PM135 are positioned side by side keep at least 150mm 5 9 between their centers to allow installation of add on modules 140mm 5 5 if only small form modules will be used Attach the PM135 unit ...

Страница 2: ...ernal CT ends with two wires Note 2B 5 1 Pass one wire through the meter CT core 5 2 Connect the wire to one of the meter optional CT wire termination screws 5 3 Connect the second wire from the external CT to the termination screw 6 Connect the measured voltage inputs 7 Connect COM1 RS 485 communication port 8 To connect the optional module 8 1 Make sure that the power is turned off 8 2 Remove th...

Страница 3: ...reens Group to change Screens to go right to go left Underlined included in Auto Scroll Voltages V L L V L N THD Ue Hz Phase Demand Currents Amps THD TDD K Factor Unbalance Demand Powers Total L1 L2 L3 Import Demand Export Demand Demands P Import P Export Amps Volts Min Max V L L V L N Amps I neutral P PF Hz Energy Import Export TOU Import Export Reg 1 Reg 2 Harmonics 3 5 7 39 Spectrum V1 V2 V3 I1...

Страница 4: ...for voltage and current demand 900 Nominal Frequency The nominal frequency 60 Hz Max Demand Load Current 0 CT primary current Other max current 0 Wiring Mode Setup 3 wire 2 element Delta direct connection using 2 CTs 3DIR2 4 wire 3 element Wye direct connection or 3PTs and 3 CTs 4LN3 or 4LL3 3 wire 2 element Open Delta connection using 2 PTs 2 CTs 3OP2 4 wire 2 element Wye connection using 2 PTs 3...

Отзывы: