Satec PM135 Скачать руководство пользователя страница 1

BG0517 REV.A1  

ENGLISH

 

PM135 QuickStart 

www.satec-global.com 

PM135 Quick Start Manual 

This quick start manual is a short guide on how to mount, connect, configure and operate the 
PM135. It is not intended to replace reading the full user manual and particularly the safety 
precautions. 

Mounting, electrical connection and settings of the PM135 shall be made in 
accordance with all applicable laws and/or regulations and be performed by 
authorized personnel only. 

 

MOUNTING  

Position the PM135 meter in 92×92mm square or 4” round cutout (Figure 1). If two PM135 are 
positioned side by side, keep at least 150mm (5.9”) between their centers to allow installation 
of add-on modules (140mm/5.5” if only small form modules will be used). 
Attach the PM135 unit using washers and nuts. Make sure that the unit is securely attached 
into the wall or cabinet fixture. 

 

 

 

Figure 1 

Win a 

Tablet! 

See back page  

Содержание PM135

Страница 1: ...135 shall be made in accordance with all applicable laws and or regulations and be performed by authorized personnel only MOUNTING Position the PM135 meter in 92 92mm square or 4 round cutout Figure 1 If two PM135 are positioned side by side keep at least 150mm 5 9 between their centers to allow installation of add on modules 140mm 5 5 if only small form modules will be used Attach the PM135 unit ...

Страница 2: ...ernal CT ends with two wires Note 2B 5 1 Pass one wire through the meter CT core 5 2 Connect the wire to one of the meter optional CT wire termination screws 5 3 Connect the second wire from the external CT to the termination screw 6 Connect the measured voltage inputs 7 Connect COM1 RS 485 communication port 8 To connect the optional module 8 1 Make sure that the power is turned off 8 2 Remove th...

Страница 3: ...reens Group to change Screens to go right to go left Underlined included in Auto Scroll Voltages V L L V L N THD Ue Hz Phase Demand Currents Amps THD TDD K Factor Unbalance Demand Powers Total L1 L2 L3 Import Demand Export Demand Demands P Import P Export Amps Volts Min Max V L L V L N Amps I neutral P PF Hz Energy Import Export TOU Import Export Reg 1 Reg 2 Harmonics 3 5 7 39 Spectrum V1 V2 V3 I1...

Страница 4: ...for voltage and current demand 900 Nominal Frequency The nominal frequency 60 Hz Max Demand Load Current 0 CT primary current Other max current 0 Wiring Mode Setup 3 wire 2 element Delta direct connection using 2 CTs 3DIR2 4 wire 3 element Wye direct connection or 3PTs and 3 CTs 4LN3 or 4LL3 3 wire 2 element Open Delta connection using 2 PTs 2 CTs 3OP2 4 wire 2 element Wye connection using 2 PTs 3...

Отзывы: