Satcom 85405 Скачать руководство пользователя страница 6

SatelliteDish.com  (954) 941-8883 

Page 6 of 7 

ATTACH THE FEEDHORN HEATERS TO THE FEEDHORNS 

1. Each conductor coming from the Feedhorn Heater Cable connects to a splitter that branches into two female
leads.  One female lead from each splitter should plug into each feedhorn heater. 
2. Route the feedhorn heater cable along the feedhorn support arm.
3. Place each feedhorn heater around its feedhorn and loosely attach it by passing the tail of the strap through
the head.  Be sure the heater wire in the feedhorn heater is against the feedhorn. 
4. Position the heater with the head of the cable tie and the connectors toward the bottom of the feedhorn and
tighten the strap fully.  Do not cut the tail off of the feedhorn heater at this time.  It will be done when the final 
test of the system is performed.  See the Feedhorn Heater Placement picture for proper placement. 
5. Use tie straps (not supplied) to anchor the Feedhorn Heater Cable near the feedhorn heater branch and
along its length. 

Feedhorn Heater Placement 

WIRE POWER TO THE CONTROL ENCLOSURE

 

1. The Anti-ice Control is supplied with a 50 foot 16 gauge 3 conductor power cable.  The power cable can be
cut to length if needed. 
2. Route the power cable to voltage source and connect the black and white wire to 240 volt single phase AC
power. 
3. Connect the green conductor to a grounding source.

* There is no need to remove any covers on the Anti-ice Control enclosures.

* The entire system supplies 2125 watts of heat and draws approximately 8.9 amps.

SECURE ALL CABLES WITH TIE STRAPS

 

1. Secure the entire lengths of the heater pad cable, the feedhorn heater cable, and the power cable with tie
straps (not supplied). 

Содержание 85405

Страница 1: ...ads consist of heater wire sandwiched between layers of aluminum foil Heater pads allow for a faster install without the need for templates The aluminum foil is coated with an aggressive acrylic adhesive and a peel and stick liner Watt density of the heater pads depending on the reflector is between 40 and 55 watts per square foot The aggressive acrylic adhesive adheres to a variety of substrates ...

Страница 2: ... half coverage 240 volt 1 85404 Controller for 3 7 meter half coverage 240 V with mounting brackets and two feedhorn heaters attached 32 Grommets 1 20x1 SS hex bolt with lockwasher and nut 2 Foil strips for lead wire attachment 1 Instruction manual for 3 7 meter 240 volt half coverage with two feedhorns Tools and Supplies Needed Self tapping screws or U bolt for sensor mounting Drill 7 16 drill bi...

Страница 3: ...er adhesion of the heater pads 3 Thoroughly clean the rear of the reflector panels with Windex and dry thoroughly 4 Test fit the pads by laying all of them on the back of the reflector See the Heater Pad Placement and Lead Connections drawing for the proper locations 5 Remove the backing paper from the heater pads one at a time and carefully apply to the cleaned reflector Smooth each pad as it is ...

Страница 4: ...AND CALIBRATE THE REFLECTOR ATTACH THE CONTROL ENCLOSURE TO THE FEEDARM 1 Pick a place on the feedarm for Control mounting The place picked should allow the Heater Pad Cable to reach the heater leads in the center of Section 1 and allow the Feedhorn Heater Cable to reach the feedhorns with enough slack lead for movement etc For in board feedhorn arms a hole may have to be drilled through the face ...

Страница 5: ...es are fully tightened Control Attachment Drawing ROUTE THE HEATER PAD CABLE AND CONNECT TO THE HEATER PADS 1 Route the Heater Pad Cable toward the male heater pad leads for connection 2 Choose a rib that will serve as the mounting location for the cordgrip on the Heater Pad Cable The cordgrip can be slid up or down the cable by loosening the plastic nut Tighten the nut after adjusting 3 Drill a 7...

Страница 6: ...s time It will be done when the final test of the system is performed See the Feedhorn Heater Placement picture for proper placement 5 Use tie straps not supplied to anchor the Feedhorn Heater Cable near the feedhorn heater branch and along its length Feedhorn Heater Placement WIRE POWER TO THE CONTROL ENCLOSURE 1 The Anti ice Control is supplied with a 50 foot 16 gauge 3 conductor power cable The...

Страница 7: ...m On time of approximately one hour The system will continue to supply heat as long as conditions warrant it 2 The controller provides AUTO OFF and ON functions These modes are user selectable through a single push button switch which alternates through each mode The normal power up mode is AUTO In this mode the controller will turn on the heater contactor when conditions are conducive to the form...

Отзывы: