explosion  may  occur causing he operator to be burned,

 

 

in case of installation malfunction and lacking water in a boiler do not fill it in, if 

boiler is hot, as it may cause its damage,

 

 

all operations regarding boiler should be performed with special care and using 

protective gloves,

 

 

all defects of boiler should be immediately removed.

 

 

NOTE: The  boiler should  be regularly cleansed  from  soot  and  tarry residues    
–    any    residue  on    the    convection    channels    walls    disrupts    proper    heat  
transfer    from    the    exchanger,  lowering  this  way  an  efficiency  of  device  and 
increases fuel consumption. 

 

7.6. STATES OF IMPROPER BOILER’S FUNCTIONING 
 

Feeder design do not require complicated operation, or costly maintenance. However 
its proper work (influencing efficiency and economy of combustion process) calls for 
following  some  rules  when  feeder  is  operated  and  also  some  necessary  activities 
should be performed. 
 
1. Furnace door should be periodically opened for checking the flame picture. 
2. Periodically remove the slung if its amount is excessive. 
3. Control fuel level in the hopper. 
4.  Check  the  hopper  and  shielding  pipe  against  coal  dust  accumulation,  if  required 

remove it. 

5. Check if air nozzles are not damaged and air orifices are not blocked. 
6. From time to time the feeder must be cleaned removing a dust and remains of coal 

or ash. 

7. Clean engines casing regularly using dry rag. 
8.  Do  not  use  solvents  for  cleaning,  as  they  may  damage  sealing  ring  and  sealing 

itself. 

9.  If  boiler  and  feeder  are  withdrawn  from  exploitation  process,  every  three  months 

the screw should be run for 15 minutes, this will prevent the screw to be blocked 
inside a pipe.    

                

 

PROBLEM 

 

CAUSE/SYMPTOM

 

REMEDY

 

Low heat 
capacity of 
device

 

 

 

gases channels obstructed

 

clean the channels through

 

washout wholes

 

lack of fresh air delivered to

 

boiler room

 

check blow-in ventilation,

 

improve its permeability

 

burning inadequate fuel

 

apply proper quality fuel (see

 

chapter  5.Fuel)

 

boiler power not up to heating

 

area

 

 

improper  design  and  erection 
of heating installation

 

 

improper 

functioning 

of 

controller or fan

 

 

adjust  controller’s  settings  up  to 
weather  conditions  or  quality  of 
fuel,  mainly  feeder  operation  time  
and fuel delivery pauses should be 

Содержание GRO-ECO

Страница 1: ...K I 28 100 Busko Zdr j Owczary ul Przemys owa 3 Phone 48 41 378 46 19 Fax 48 41 370 83 10 TECHNICAL START UP DOCUMENTATION of water boilers for heating installations SAS GRO ECO type adopted for black...

Страница 2: ...o electrical installation 10 7 Operation and exploitation guidelines 10 7 1 Filling with water 10 7 2 Firing up and functioning of a boiler 10 7 2 1 Firing up and functioning of a boiler in automatic...

Страница 3: ...3...

Страница 4: ...4...

Страница 5: ...lculated feeding water temperature does not exceed 85 C and working pressure does not exceed 1 5 bar Required gases draught pressure after a boiler is 0 30 0 55 mbar depending on boiler s power These...

Страница 6: ...antage is a simple operation relaying on periodic coal bunker refueling the fuel bunker and cinder removing from the ash drawer with no requirement to stop the boiler Once boiler is fired up it does n...

Страница 7: ...g coal should not tend to stick when burner Volatile particles content 30 40 It is recommended to use coal which is prone to agglomeration coking although it is good caloric properties higher losses o...

Страница 8: ...OTE Employing of mechanical blow out ventilation is unacceptable The boiler room should be provided with day and artificial lighting 6 2 BOILER ARRANGEMENT Special foundation for boiler is not require...

Страница 9: ...required to apply flue insert however in year round exploitation it is recommended to provide heating to the hot utility water container 6 4 CONNECTING BOILER TO HEATING INSTALLATION The boiler should...

Страница 10: ...y allowing the air residing in the installation to be removed It is accomplished when water is going out of overflow pipe When filling the heating system installation with water it is recommended to l...

Страница 11: ...el quality may cause the boiler to burn out If the fire is out during up phase the furnace should be cleaned and boiler s channels ventilated and the whole starting procedure must be repeated Once boi...

Страница 12: ...sition of the gate valve At the same time the controller operates the heating system circulation pump if such is provided Heat requirement in the heat installation is varying due to changing outdoor c...

Страница 13: ...Required chimney draught mbar 0 30 0 45 9 Exhaust temperature C 90 210 10 Recommended heating water working temp C 60 80 11 Maximal allowable working temperature C 85 12 Maximal allowable operating pr...

Страница 14: ...chimney draught mbar 0 55 9 Exhaust temperature C 90 210 10 Recommended heating water working temp C 60 80 11 Maximal allowable working temperature C 85 12 Maximal allowable operating pressure bar 1 5...

Страница 15: ...turn water connector pipe 13 blowdown connection 14 lateral washout hole door 15 blowing fan 16 feeder drive mechanism 17 deflector 18 retort burner 19 water jacket 20 ash box 21 safety valve 22 aerat...

Страница 16: ...controller 11 smoke conduit cleaning hole 12 smoke conduit 13 smoke throttle 14 safety valve 15 upper washout hole cover 16 hot water connector pipe 17 fuel storage bin 18 blowing fan 19 feeder drive...

Страница 17: ...hed or when switching off the boiler is scheduled the controller should be then switched off and the glowing batch should be removed from retort and push into ash box chamber Once boiler is out and co...

Страница 18: ...lung if its amount is excessive 3 Control fuel level in the hopper 4 Check the hopper and shielding pipe against coal dust accumulation if required remove it 5 Check if air nozzles are not damaged and...

Страница 19: ...en temperature and pressure rise installation valves closed open the valves pressure vessel frozen heat the pressure vessel Water licking out of boiler so called boiler s sweating this is natural proc...

Страница 20: ...llic sensor is faulty If temperature of 95 C is exceeded cutting off power supply to blow in fan and fuel feeder is executed FUEL BUNKER PROTECTION A controller is additionally protected against flame...

Страница 21: ...components mounted on the boiler and produced by other manufacturers controller blowing fan safety valve automatic fuel delivery system details of the manufacturer warranty 5 Warranty does not cover...

Страница 22: ...eserves the right to introduce changes in the construction of the product for modernization purpose Such changes may not be reflected in hereby documentation however basic described properties of the...

Страница 23: ...23 SERVICE REPAIRS...

Страница 24: ...erature boiler of SAS GRO ECO type installed and operated in pursuance of Technical Start Up Documentation Boiler no Heating capacity Heated surface Year of manufacture Manufacturer signature and stam...

Отзывы: