SAS GRO-ECO Скачать руководство пользователя страница 13

 

 

   

 w

h

e

n

 w

o

rk

in

g

 a

a

v

e

ra

g

e

 lo

a

d

 (

5

0

%

 o

ra

te

d

 p

o

w

e

r)

/

 r

a

te

d

 lo

a

d

 

**

   

 if

 m

a

n

u

fa

c

tu

re

re

c

o

m

m

e

n

d

a

ti

o

n

re

g

a

rd

in

g

 h

e

a

tin

g

 w

a

te

te

m

p

e

ra

tu

re

 r

a

n

g

e

a

re

 n

o

o

b

se

rv

e

d

b

o

ile

m

u

st

 

b

e

 o

b

lig

a

to

ry

 c

o

n

n

e

c

te

d

  t

o

 c

e

n

tr

a

l h

e

a

tin

g

 s

y

st

e

m

 e

q

u

ip

p

e

d

 w

it

h

 t

h

re

e

- o

fo

u

– w

a

y

v

a

lv

e

p

ro

te

c

ti

n

g

 

a

g

a

in

st

 s

o

 c

a

lle

d

 „

 lo

w

 t

e

m

p

e

ra

tu

re

c

o

rr

o

si

o

n

   

 

 

No. 

Parameter 

Unit 

SAS GRO-ECO 

1. 

Boiler power  

kW 

17 

23 

29 

36 

42 

48 

2. 

Boiler heated surface 

m

2

 

1.5 

2.0 

2.5 

3.0 

3.5 

4.0 

3. 

Boiler efficiency 

%

 

81,7 ÷ 87,8 

4. 

Fuel consumpcion* 

kg/h 

1,1 

1,9 

2,5 

3,0 

3,6 

4,1 

5. 

Load chamber capacity 

dm

3

 

kg 

100 
~75 

120 
~90 

150 

~110 

180 

~130 

200 

~150 

240 

~170 

6. 

Boiler water capicity 

100 

120 

130 

140 

160 

190 

7. 

Boiler weight (without water) 

kg 

430 

560 

600 

640 

680 

740 

8. 

Required chimney draught 

mbar 

0,30 

0,45 

9. 

Exhaust temperature 

°C 

90 ÷ 210 

10. 

Recommended heating water working 
temp. 

°C 

60 ÷ 80 

11. 

Maximal allowable working temperature 

°C 

85 

12. 

Maximal allowable operating pressure 

bar 

1,5 

13. 

Minimal return water temp.** 

°C 

55 

14. 

Power supply 

V/Hz 

~230 / 50 

15. 

Power consumption 

to 180 

16. 

D

im

e

ns

io

ns

 

mm 

1170 

1200 

1200 

1200 

1200 

1280 

A1 

290 

290 

290 

290 

290 

290 

1090 

1210 

1210 

1270 

1270 

1270 

B1 

450 

530 

530 

600 

600 

600 

1250 

1430 

1500 

1500 

1580 

1580 

H1 

1140 

1310 

1380 

1380 

1480 

1480 

H2 

870 

980 

1060 

1040 

1120 

1120 

380 

430 

430 

430 

430 

500 

200 

220 

240 

240 

240 

240 

17. 

Smoke conduit diameter    

mm 

Ø 180 

Ø 180 

Ø 200 

Ø 200 

Ø 220 

Ø 220 

18. 

Connector pipe diameter (supply/return) 

G 1½ 

G 2 

19. 

Min. chimney height 

20. 

Minimal chimney dimensions/diameter 

cmxcm 

mm 

18x18 

Ø 210 

20x20 

Ø 220 

21x21 

Ø 240 

22x22 

Ø 250 

25x25 

Ø 280 

25x25 

Ø 280 

TECHNICAL AND OPERATING PARAMETERS OF SAS GRO-ECO BOILER

 

Содержание GRO-ECO

Страница 1: ...K I 28 100 Busko Zdr j Owczary ul Przemys owa 3 Phone 48 41 378 46 19 Fax 48 41 370 83 10 TECHNICAL START UP DOCUMENTATION of water boilers for heating installations SAS GRO ECO type adopted for black...

Страница 2: ...o electrical installation 10 7 Operation and exploitation guidelines 10 7 1 Filling with water 10 7 2 Firing up and functioning of a boiler 10 7 2 1 Firing up and functioning of a boiler in automatic...

Страница 3: ...3...

Страница 4: ...4...

Страница 5: ...lculated feeding water temperature does not exceed 85 C and working pressure does not exceed 1 5 bar Required gases draught pressure after a boiler is 0 30 0 55 mbar depending on boiler s power These...

Страница 6: ...antage is a simple operation relaying on periodic coal bunker refueling the fuel bunker and cinder removing from the ash drawer with no requirement to stop the boiler Once boiler is fired up it does n...

Страница 7: ...g coal should not tend to stick when burner Volatile particles content 30 40 It is recommended to use coal which is prone to agglomeration coking although it is good caloric properties higher losses o...

Страница 8: ...OTE Employing of mechanical blow out ventilation is unacceptable The boiler room should be provided with day and artificial lighting 6 2 BOILER ARRANGEMENT Special foundation for boiler is not require...

Страница 9: ...required to apply flue insert however in year round exploitation it is recommended to provide heating to the hot utility water container 6 4 CONNECTING BOILER TO HEATING INSTALLATION The boiler should...

Страница 10: ...y allowing the air residing in the installation to be removed It is accomplished when water is going out of overflow pipe When filling the heating system installation with water it is recommended to l...

Страница 11: ...el quality may cause the boiler to burn out If the fire is out during up phase the furnace should be cleaned and boiler s channels ventilated and the whole starting procedure must be repeated Once boi...

Страница 12: ...sition of the gate valve At the same time the controller operates the heating system circulation pump if such is provided Heat requirement in the heat installation is varying due to changing outdoor c...

Страница 13: ...Required chimney draught mbar 0 30 0 45 9 Exhaust temperature C 90 210 10 Recommended heating water working temp C 60 80 11 Maximal allowable working temperature C 85 12 Maximal allowable operating pr...

Страница 14: ...chimney draught mbar 0 55 9 Exhaust temperature C 90 210 10 Recommended heating water working temp C 60 80 11 Maximal allowable working temperature C 85 12 Maximal allowable operating pressure bar 1 5...

Страница 15: ...turn water connector pipe 13 blowdown connection 14 lateral washout hole door 15 blowing fan 16 feeder drive mechanism 17 deflector 18 retort burner 19 water jacket 20 ash box 21 safety valve 22 aerat...

Страница 16: ...controller 11 smoke conduit cleaning hole 12 smoke conduit 13 smoke throttle 14 safety valve 15 upper washout hole cover 16 hot water connector pipe 17 fuel storage bin 18 blowing fan 19 feeder drive...

Страница 17: ...hed or when switching off the boiler is scheduled the controller should be then switched off and the glowing batch should be removed from retort and push into ash box chamber Once boiler is out and co...

Страница 18: ...lung if its amount is excessive 3 Control fuel level in the hopper 4 Check the hopper and shielding pipe against coal dust accumulation if required remove it 5 Check if air nozzles are not damaged and...

Страница 19: ...en temperature and pressure rise installation valves closed open the valves pressure vessel frozen heat the pressure vessel Water licking out of boiler so called boiler s sweating this is natural proc...

Страница 20: ...llic sensor is faulty If temperature of 95 C is exceeded cutting off power supply to blow in fan and fuel feeder is executed FUEL BUNKER PROTECTION A controller is additionally protected against flame...

Страница 21: ...components mounted on the boiler and produced by other manufacturers controller blowing fan safety valve automatic fuel delivery system details of the manufacturer warranty 5 Warranty does not cover...

Страница 22: ...eserves the right to introduce changes in the construction of the product for modernization purpose Such changes may not be reflected in hereby documentation however basic described properties of the...

Страница 23: ...23 SERVICE REPAIRS...

Страница 24: ...erature boiler of SAS GRO ECO type installed and operated in pursuance of Technical Start Up Documentation Boiler no Heating capacity Heated surface Year of manufacture Manufacturer signature and stam...

Отзывы: