be  connected    to    the    heating    installation    equipped    with        three-    or    four-pass  
valve  protecting  it  against  low temperature corrosion.

 

 

 
6.5. CONNECTING BOILER TO ELECTRICAL INSTALLATION

 

 

Boiler  room  should  be  equipped  with  electrical  installation  230V/50Hz  should  
be  according  to  detailed regulations being in force in the country of destination. 
Electric  socked  should  be  earthed.  Grounding  functionality  should  be  checked. 
Cable  extensions  are forbidden.  Faulty  installation  may  cause the controller  to be  
destroyed   or be  unsafe for the user. Controller and  other cooperating devices are 
powered with 230 V,  therefore all connections shell be made  by qualified personnel 
(certified electrician).  
Electrical    cables    of    powered    devices    should    be    placed    away    from    boiler’s  
parts,    which    tend    to    be    hot  during  exploitation  of  boiler  (cover  of  the  upper 
washout hole, smoke conduit, door)

 

 
 
 
 
 
7.1. FILING WITH WATER

 

 
Boiler  and  the  entire  installation  water  filling  is  to  be  performed  using  blowdown 
connection. 

 

This  activity  should  be  performed  slowly  allowing  the  air  residing  in  the  
installation  to  be removed. 
It  is  accomplished  when water  is  going  out  of  overflow  pipe.  When  filling  the  
heating  system  installation with water it is recommended to loose screw connection 
at  the  place  of  boiler  –  installation  assembly  (on  the  hot  water  connector).    Once 
water is flowing out, tight the connection. 

 

NOTE: Filling installation  with  water when boiler  is  in  use,  especially  if  it  is  
very hot  is strictly forbidden, as boiler’s damage or  fracture may be caused. 

 

Once  heating  season  is  over  do  not  get  rid  of  water  from  heating  installation  and 
boiler. When  required,  water may  be  let of  through blowdown  connection to a drain 
once it is cooled down. 

 
7.2. FIRING UP AND FUNCTIONING OF A BOILER 
 

Firing up a fuel in boiler should be started when checked if heating installation is filled 
with  water,  and  water  is  not    frozen.  It  should  also    be    checked,    if    water    is    not 
leaking through thread fittings on boiler. Do not forget to heat the chimney prior to the 
firs startup. 
 

 

Person  operating the boiler  should  know  that  some of  boiler’s  areas  are  
hot,    therefore    protective  gloves  should  be  worn!  The  same  applies  to 
protective goggles. 

7.

  

OPERATION AND EXPLOITATION GUIDELINES 

BOILER ASSEMBLY GUIDELINES

Содержание GRO-ECO

Страница 1: ...K I 28 100 Busko Zdr j Owczary ul Przemys owa 3 Phone 48 41 378 46 19 Fax 48 41 370 83 10 TECHNICAL START UP DOCUMENTATION of water boilers for heating installations SAS GRO ECO type adopted for black...

Страница 2: ...o electrical installation 10 7 Operation and exploitation guidelines 10 7 1 Filling with water 10 7 2 Firing up and functioning of a boiler 10 7 2 1 Firing up and functioning of a boiler in automatic...

Страница 3: ...3...

Страница 4: ...4...

Страница 5: ...lculated feeding water temperature does not exceed 85 C and working pressure does not exceed 1 5 bar Required gases draught pressure after a boiler is 0 30 0 55 mbar depending on boiler s power These...

Страница 6: ...antage is a simple operation relaying on periodic coal bunker refueling the fuel bunker and cinder removing from the ash drawer with no requirement to stop the boiler Once boiler is fired up it does n...

Страница 7: ...g coal should not tend to stick when burner Volatile particles content 30 40 It is recommended to use coal which is prone to agglomeration coking although it is good caloric properties higher losses o...

Страница 8: ...OTE Employing of mechanical blow out ventilation is unacceptable The boiler room should be provided with day and artificial lighting 6 2 BOILER ARRANGEMENT Special foundation for boiler is not require...

Страница 9: ...required to apply flue insert however in year round exploitation it is recommended to provide heating to the hot utility water container 6 4 CONNECTING BOILER TO HEATING INSTALLATION The boiler should...

Страница 10: ...y allowing the air residing in the installation to be removed It is accomplished when water is going out of overflow pipe When filling the heating system installation with water it is recommended to l...

Страница 11: ...el quality may cause the boiler to burn out If the fire is out during up phase the furnace should be cleaned and boiler s channels ventilated and the whole starting procedure must be repeated Once boi...

Страница 12: ...sition of the gate valve At the same time the controller operates the heating system circulation pump if such is provided Heat requirement in the heat installation is varying due to changing outdoor c...

Страница 13: ...Required chimney draught mbar 0 30 0 45 9 Exhaust temperature C 90 210 10 Recommended heating water working temp C 60 80 11 Maximal allowable working temperature C 85 12 Maximal allowable operating pr...

Страница 14: ...chimney draught mbar 0 55 9 Exhaust temperature C 90 210 10 Recommended heating water working temp C 60 80 11 Maximal allowable working temperature C 85 12 Maximal allowable operating pressure bar 1 5...

Страница 15: ...turn water connector pipe 13 blowdown connection 14 lateral washout hole door 15 blowing fan 16 feeder drive mechanism 17 deflector 18 retort burner 19 water jacket 20 ash box 21 safety valve 22 aerat...

Страница 16: ...controller 11 smoke conduit cleaning hole 12 smoke conduit 13 smoke throttle 14 safety valve 15 upper washout hole cover 16 hot water connector pipe 17 fuel storage bin 18 blowing fan 19 feeder drive...

Страница 17: ...hed or when switching off the boiler is scheduled the controller should be then switched off and the glowing batch should be removed from retort and push into ash box chamber Once boiler is out and co...

Страница 18: ...lung if its amount is excessive 3 Control fuel level in the hopper 4 Check the hopper and shielding pipe against coal dust accumulation if required remove it 5 Check if air nozzles are not damaged and...

Страница 19: ...en temperature and pressure rise installation valves closed open the valves pressure vessel frozen heat the pressure vessel Water licking out of boiler so called boiler s sweating this is natural proc...

Страница 20: ...llic sensor is faulty If temperature of 95 C is exceeded cutting off power supply to blow in fan and fuel feeder is executed FUEL BUNKER PROTECTION A controller is additionally protected against flame...

Страница 21: ...components mounted on the boiler and produced by other manufacturers controller blowing fan safety valve automatic fuel delivery system details of the manufacturer warranty 5 Warranty does not cover...

Страница 22: ...eserves the right to introduce changes in the construction of the product for modernization purpose Such changes may not be reflected in hereby documentation however basic described properties of the...

Страница 23: ...23 SERVICE REPAIRS...

Страница 24: ...erature boiler of SAS GRO ECO type installed and operated in pursuance of Technical Start Up Documentation Boiler no Heating capacity Heated surface Year of manufacture Manufacturer signature and stam...

Отзывы: