![Sartorius PMA.Vision VIS1Y Скачать руководство пользователя страница 121](http://html1.mh-extra.com/html/sartorius/pma-vision-vis1y/pma-vision-vis1y_installation-instructions-manual_1199777121.webp)
Installation Instructions VIS1Y
121
Appendix
Mick Gower
Certification Manager, FM Approvals Ltd.
Issue date: 09
th
March 2016
THIS CERTIFICATE MAY ONLY BE REPRODUCED IN ITS ENTIRETY AND WITHOUT CHANGE
FM Approvals Ltd. 1 Windsor Dials, Windsor, Berkshire, UK. SL4 1RS
T: +44 (0) 1753 750 000 F: +44 (0) 1753 868 700 E-mail:
[email protected] www.fmapprovals.com
F ATEX 029 (Apr/14)
Page 1 of 3
1
TYPE EXAMINATION CERTIFICATE
2
Equipment or Protective systems intended for use in Potentially
Explosive Atmospheres - Directive 94/9/EC
3
Type Examination Certificate No:
FM15ATEX0033X
4
Equipment or protective system:
(Type Reference and Name)
PMA.Vision VIS1Y…-… weighing unit
5
Name of Applicant:
Sartorius Lab Instruments GmbH & Co. KG
6
Address of Applicant:
Weender Landstrasse 94 - 108
Goettingen 37075
Germany
7
This equipment or protective system and any acceptable variation thereto is specified in the schedule to this
certificate and documents therein referred to.
8
FM Approvals Ltd. certifies that this equipment has been found to comply with the Essential Health and
Safety Requirements relating to the design and construction of equipment intended for use in potentially
explosive atmospheres given in Annex II to the Directive.
The examination and test results are recorded in confidential report number:
3055566 dated 29
th
February 2016
9
Compliance with the Essential Health and Safety Requirements, with the exception of those identified in
item 15 of the schedule to this certificate, has been assessed by compliance with the following documents:
EN 60079-0:2012 + A11:2013, and EN 60079-11:2012
10
If the sign ‘X’ is placed after the certificate number, it indicates that the equipment is subject to specific
conditions of use specified in the schedule to this certificate.
11
This Type Examination certificate relates only to the design, examination and tests of the specified
equipment or protective system in accordance to the directive 94/9/EC. Further requirements of the Directive
apply to the manufacturing process and supply of this equipment or protective system. These are not
covered by this certificate.
12
The marking of the equipment or protective system shall include:
II 3 G Ex ic IIB T4 Gc Ta = 0°C to 40°C
cn=Mick Gower, o=FM Approvals,
ou,
email=mick.gower@fmapprovals.
com, c=GB
2016.03.09 13:30:31 Z