12
13
40
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
Flag Mount Installation - Square Clock
12) Attach the base of the pole to the mounting plate, so that the lip is on the top of the base, and the
holes for the screws are on the bottom of the base. Hang the base on the mounting plate, attach the
wires from the bottom of the pole to the wires in the gang box, then screw the other side of the base
onto the mounting plate using the two black screws you set aside before.
13) Attach the signal and power wires from your kit to the wires you threaded through the pole. Consult
the diagrams below for additional help, or see the sections of this manual labeled “3-Wire Synchronous
(Sync-Wire) Communication Wiring Information” or “2-Wire Digital Communication Wiring Information”
for additional details, depending on your system.
3-Wire Sync
Yellow
Black
White
Black
White
Yellow
27/24
26/23
To next
clock
Power
Common
Master Clock
CLOCK 1
Gang
Box
Green
Gr
een
Ground
2-Wire Digital
Black
White
Black
White
18
19
To next
clock
M
as
ter
C
lo
ck
CLOCK 1
Gang
Box
115VAC or
230VAC
A2/B2/C2
A1/B1/C1
Input A
Input B
Converter
Box
CEILING
WALL
1
2
1
2