INSTALLATION
Assembling of the solenoid valve
1.
The joint nut on the outlet side of the CO
2
solenoid valve is removed. The valve outlet pipe with the
pipe insulation is inserted into the joint nut, and fastened in the joint. (Fig. 1) Fasten a joint part securely
so that CO
2
gas can not leak out. (Fig. 2).
2.
Insulation is fixed with a SK band. (Two places) (Fig. 3).
CAUTION
Check the gas piping before trial operation to avoid gas leakage. The nut marked with
※
in Fig. 1 is not fixed surely. Tighten it completely by assembling, and enforce a leak
test.
Fig. 1
Valve outlet pipe
Pipe insulation
LCO
2
solenoid valve
Outlet side
㶎
㶎
※
Fig. 2
Insulation
Valve outlet pipe
Joint
Joint nut
Fig. 3
SK band
Mounting plate B
Содержание MDF-C8V
Страница 8: ...5 Dimensions 405 490 R 2 5 550 58 852 945 425 887 35 727 685 33 㧨 8㧪 ...
Страница 9: ...6 Refrigeration circuit diagram ...
Страница 12: ...9 Components on PCB ...
Страница 15: ...12 Wiring diagram ...
Страница 16: ...13 Circuit diagram ...
Страница 36: ...33 MDF C8V Ultra Low Temperature Freezer INSTRUCTION MANUAL ...
Страница 44: ...41 8 FREEZER COMPONENTS 13 12 5 11 1 2 3 6 7 8 5 4 10 9 ...
Страница 76: ...73 CVK UB4 CVK UB4 I Back up System for Ultra Low Temperature Freezer INSTRUCTION MANUAL ...
Страница 92: ...1 JK1659 150B ...