Installation
27
§
§
1
1
0
0
.
.
1
1
.
.
3
3
S
S
e
e
t
t
t
t
i
i
n
n
g
g
C
C
h
h
e
e
c
c
k
k
Check the following items before installation.
①
Check that the battery breaker BATT MCCB is set to “ON”.
After checking, attach the battery breaker cover removed in the step §6 “Wiring”.
②
Check that the bypass breaker BYPASS OC is set to “ON”.
③
Check that the input breaker MAIN MCCB is set to “OFF”.
④
Check that load devices are connected correctly.
Rear View
Rear View
MCCB
①
BATT MCCB is “ON”.
Attach the cover using two
screws.
②
BYPASS OC is set to “ON”.
ON Tripped
①
BATT MCCB is “ON”.
Attach the cover using two
screws.
②
BYPASS OC is set to
“ON”.
③
MAIN MCCB is set to
“OFF”.
④
Check that load device is
connected correctly.
③
MAIN MCCB is set to
“OFF”.
④
Check that load devices are
connected correctly.
This completes checking.
A
A
1
1
1
1
H
H
2
2
0
0
2
2
U
U
A
A
1
1
1
1
H
H
3
3
0
0
2
2
U
U
Содержание A11H
Страница 1: ...Instruction Manual 120V Model 2kVA 3kVA Uninterruptible Power Supply M0008068...
Страница 70: ...Blank page...
Страница 71: ...Blank page...
Страница 72: ......