KBox B-201-CFL - User Guide, Rev 1.3
// 42
8.4.
VESA 100 Mount Assembly (Option)
The VESA mount assembly mounts the KBox B-201-CFL and external power supply on the rear side of a VESA 100
monitor.
Figure 27: VESA Mounting Assembly Kit
The VESA 100 mount assembly kit contains:
1.
VESA 100 mounting frame
2.
Hook and loop band
3.
4x screws (M4x 20 mm)
4.
4x screws (M3x 8 mm)
5.
4x spacers (4 mm)
Using the VESA 100 mount assembly, only vertical mounting is possible.
To assemble the KBox B-201-CFL with power supply on the VESA 100 mounting frame, perform the following:
1.
Check if chassis feet are installed on the bottom side of the chassis . If feet are installed, removed the feet
before mounting on the VESA 100 mounting frame.
2.
Align the four mounting holes on the bottom side of the chassis with the four mounting holes on the VESA
100 mounting frame.
Figure 28: KBox B-201-CFL Mounting Position
3.
Insert the supplied four M3x 8 mm screws into the rear side of the VESA 100 mounting frame and using a
Torx screwdriver (10) fasten the chassis to the VESA 100 mounting frame.
4.
Open the flexible hook and loop band to the band’s full length and with the rough fastening side facing
downward feed the band through the threading slots on the left and right aligning brackets, (Figure 29).