5.13.2 Shifting Line
[ShiftL]: Input horizontal shifting value to horizontally shift the line.
The line can be horizontally shifted according to the requirement of job.
STEPS
DISPLAY
To shift the construction site, turn to 2
nd
page of the function key bar and press
ShiftL.
【
Stake Out
】
PtID:
3
R.HT
1.5000 m
Ln
----.--- m
Of
----.--- m
H
----.--- m
All
DIST
CHECK
↓
DIST
RECORD
ShiftL
│←
Input the distance value to shift.
【
Shift the Line
】
Defining new Site!
R_Shift
:
0.000 m
L_Shift
:
0.000 m
Up_Shift
:
0.000 m
0SET
REVERS
OK
5.13.3 As Build Check
This function shows you the line difference, offset, and the height difference of a
measured point in relation to the line.
STEPS
DISPLAY
Press CHECK.
Input the PtID of the point to measure and
its prism height.
【
AS-BuiltCheck
】
PtID:
3
R.HT
1.5000 m
Ln
----.--- m
Of
----.--- m
H
----.--- m
All
DIST
STAKE
↓
Collimate the prism and press DIST.
It
displays
the
longitude
offset,
transversal offset and the height offset
between the point to measure and the
construction site. A graph will also show
the positions of the prism, station and
construction site on the right.
【
AS-BuiltCheck
】
PtID:
3
R.HT
1.5000 m
Ln
2.259 m
Of
-0.257 m
H
1.305 m
All
DIST
STAKE
↓
X
----.--- m
---.--- m