S&C BankGuard PLUS Скачать руководство пользователя страница 15

15

1011-550

Password

When this field displays a 4-digit password, the control device requires a password to
make changes from the faceplate.

Location

This is the location of the control device. This information (up to 100 characters) may
help identify the control device to the SCADA master station operator and appears on
all reports generated from the control device. 

Product                  
Information

The 

Product Information

 screen (Figure 2) includes information about the hardware

and software for your control.

To display the Product Information screen:

Click the Prod Info button from any IntelliLINK screen.

Figure 2. Product Information Screen

Содержание BankGuard PLUS

Страница 1: ...ty 2 Latest Document Release 2 SAFETY INFORMATION Understanding Safety Alert Messages 3 Following Safety Instructions 3 Replacement Instructions and Labels 3 TROUBLESHOOTING Applicable Software 5 Over...

Страница 2: ...he equipment covered by this publication must be installed operated and main tained by qualified persons who are knowledgeable in the installation operation and maintenance of overhead electric power...

Страница 3: ...damaged or faded labels on the equipment be replaced immediately Replacement labels are available by contacting your nearest S C Sales Office S C Headquarters or S C Electric Canada Ltd DANGER DANGER...

Страница 4: ...1011 550 4...

Страница 5: ...electric distri bution equipment when electrical isolation and grounding procedures are not fol lowed The equipment described in this document must be operated and maintained by qualified persons who...

Страница 6: ...roblem you may need one or more of the following tools Multi meter 4 long 2 Phillips screwdriver 4 long 1 4 blade screwdriver NOTICE If the suggested troubleshooting steps do not resolve the problem c...

Страница 7: ...7 1011 550 Quick Reference Guide...

Страница 8: ...ON but the other LEDs do the LED is probably bad If none of the LEDs turn ON see Emphasis Italic LCD is blank C Check the Lockout Level and Lockout Time Delay setpoints The control device may not be...

Страница 9: ...problem with one of the files See To Install the IntelliLINK Software in the Setup Instruction Sheet 1011 530 for details Opening port COM1 Trying 9600 BAUD Connection Failed These messages appear in...

Страница 10: ...ge is zero on the Operation screen A Check the applicable potential devices Check that the wiring is securely connected to the potential devices and to the control device Check that the wiring is not...

Страница 11: ...n to the N G Voltage display without accepting the value press ESC LOCKOUT LEVEL button Pressing the LOCKOUT LEVEL button displays the following in order Lockout Level setpoint Lockout Time Delay setp...

Страница 12: ...for more details see To Start the IntelliLINK Software in the Setup Instruction Sheet 1011 530 If the IntelliLINK software is already started click the Operation button from any screen Figure 1 Opera...

Страница 13: ...display the capacitor bank neutral to ground voltage The maximum voltage displayed is 65 536 Volts divided by the voltage sensor ratio This field will display that maximum value even when voltage is...

Страница 14: ...o Ground Ratio This field shows the voltage ratio setting for the neutral to ground potential device Nominal Operating Frequency This is the nominal operating frequency in Hz for your distribution sys...

Страница 15: ...100 characters may help identify the control device to the SCADA master station operator and appears on all reports generated from the control device Product Information The Product Information scree...

Страница 16: ...the message Obsolete Release Encoded This is a six digit hexadecimal encoding of the name version information for the soft ware in the control This code is used by S C staff during software troublesho...

Отзывы: