background image

1011-550

2

Qualified Persons

Read this
Instruction Sheet

Thoroughly and carefully read this instruction sheet before programming, operating, or
maintaining your IntelliTEAM II Interface Module. Familiarize yourself with “SAFETY
INFORMATION” on pages 3 and 4.

Retain this
Instruction Sheet

This instruction sheet is a permanent part of your IntelliTEAM II Interface Module.
Designate a location where you can easily retrieve and refer to this publication.

Warranty

The standard warranty contained in S&C’s standard conditions of sale, as set forth in
Price Sheet 150, is applicable to the IntelliTEAM II Interface Module.

Latest Document 
Release

The latest release of this instruction sheet is available online at www.sandc.com.
Select:  Support/ Product Support Documents. Documents are posted in PDF format.

!

WARNING

The equipment covered by this publication must be installed, operated, and main-
tained by qualified persons who are knowledgeable in the installation, operation, and
maintenance of overhead electric power distribution equipment along with the asso-
ciated hazards. A qualified person is one who is trained and competent in:

•  

The skills and techniques necessary to distinguish exposed live parts from non-live
parts of electrical equipment.

•   

The skills and techniques necessary to determine the proper approach distances cor-

responding to the voltages to which the qualified person will be exposed.

The proper use of the special precautionary techniques, personal protective equip-

ment, insulating and shielding materials, and insulated tools for working on or near
exposed energized parts of electrical equipment.

These instructions are intended only for such qualified persons. They are 

not

 intended

to be a substitute for adequate training and experience in safety procedures for this type
of equipment.

INTRODUCTION

Содержание BankGuard PLUS

Страница 1: ...ty 2 Latest Document Release 2 SAFETY INFORMATION Understanding Safety Alert Messages 3 Following Safety Instructions 3 Replacement Instructions and Labels 3 TROUBLESHOOTING Applicable Software 5 Over...

Страница 2: ...he equipment covered by this publication must be installed operated and main tained by qualified persons who are knowledgeable in the installation operation and maintenance of overhead electric power...

Страница 3: ...damaged or faded labels on the equipment be replaced immediately Replacement labels are available by contacting your nearest S C Sales Office S C Headquarters or S C Electric Canada Ltd DANGER DANGER...

Страница 4: ...1011 550 4...

Страница 5: ...electric distri bution equipment when electrical isolation and grounding procedures are not fol lowed The equipment described in this document must be operated and maintained by qualified persons who...

Страница 6: ...roblem you may need one or more of the following tools Multi meter 4 long 2 Phillips screwdriver 4 long 1 4 blade screwdriver NOTICE If the suggested troubleshooting steps do not resolve the problem c...

Страница 7: ...7 1011 550 Quick Reference Guide...

Страница 8: ...ON but the other LEDs do the LED is probably bad If none of the LEDs turn ON see Emphasis Italic LCD is blank C Check the Lockout Level and Lockout Time Delay setpoints The control device may not be...

Страница 9: ...problem with one of the files See To Install the IntelliLINK Software in the Setup Instruction Sheet 1011 530 for details Opening port COM1 Trying 9600 BAUD Connection Failed These messages appear in...

Страница 10: ...ge is zero on the Operation screen A Check the applicable potential devices Check that the wiring is securely connected to the potential devices and to the control device Check that the wiring is not...

Страница 11: ...n to the N G Voltage display without accepting the value press ESC LOCKOUT LEVEL button Pressing the LOCKOUT LEVEL button displays the following in order Lockout Level setpoint Lockout Time Delay setp...

Страница 12: ...for more details see To Start the IntelliLINK Software in the Setup Instruction Sheet 1011 530 If the IntelliLINK software is already started click the Operation button from any screen Figure 1 Opera...

Страница 13: ...display the capacitor bank neutral to ground voltage The maximum voltage displayed is 65 536 Volts divided by the voltage sensor ratio This field will display that maximum value even when voltage is...

Страница 14: ...o Ground Ratio This field shows the voltage ratio setting for the neutral to ground potential device Nominal Operating Frequency This is the nominal operating frequency in Hz for your distribution sys...

Страница 15: ...100 characters may help identify the control device to the SCADA master station operator and appears on all reports generated from the control device Product Information The Product Information scree...

Страница 16: ...the message Obsolete Release Encoded This is a six digit hexadecimal encoding of the name version information for the soft ware in the control This code is used by S C staff during software troublesho...

Отзывы: