S&C BankGuard PLUS Скачать руководство пользователя страница 13

13

1011-550

Alarm Indicator LED and button

If this “LED” is ON, the control device has set a voltage alarm the bank/reactor (based
on the “Alarm Level” and “Alarm Time Delay” setpoints). To clear the LED and the
alarm, click the ALARM INDICATOR RESET button. Click OK.

NOTE: If the conditions that led to the alarm are still present, the control device will set
the alarm again after the “Alarm Time Delay” has elapsed.

Model Number

This field shows the model number for this control device.

Control Software Revision

This field shows the S&C name for the Control Device software version present in this
control device.

Serial Number

This field shows the serial number of this control device.

Installation Type

This is the type of installation with which this control device is used: ungrounded wye-
connected shunt capacitor bank (“Ungnd Wye Cap Bank”), grounded wye-connected
shunt capacitor bank (“Gnd Wye Cap Bank”), or ungrounded wye-connected shunt
reactor (“Ungnd Wye Reactor”). This value is set on the 

Setup

 screen.

N-G/Unbalance Voltage

For ungrounded, wye-connected capacitor banks / reactors these fields display the
capacitor bank neutral-to-ground voltage. The maximum voltage displayed is 65,536
Volts divided by the voltage sensor ratio. This field will display that maximum value
even when voltage is above that limit. When the Installation Type is 

Gnd Wye Cap

(Grounded Wye Capacitor Bank) this field displays the sum of the three intermediate-
tap-point voltages (percent of unbalance) in percent.

Unbalance Compensation in Use

This field shows the present magnitude of the correction value that the control device
is using to compensate for neutral-to-ground error voltages. These voltages may be
caused by system voltage imbalances and/or inherent capacitor unit variations. If the
Unbalance Compensation feature is disabled, this field displays “Disabled”.

Lockout Level

This is the voltage level or tap-point voltage percent imbalance at which the control
device isolates and locks out the bank or reactor after capacitor unit or reactor turn
failures. 

Lockout Time Delay

This is the amount of time (in seconds) that the neutral-to-ground voltage must exceed
the “Lockout Level” setpoint before the control device isolates and locks out the bank
or reactor.

Alarm Level

This is the voltage level or tap-point voltage percent imbalance at which the control
device issues an optional alarm. 

Содержание BankGuard PLUS

Страница 1: ...ty 2 Latest Document Release 2 SAFETY INFORMATION Understanding Safety Alert Messages 3 Following Safety Instructions 3 Replacement Instructions and Labels 3 TROUBLESHOOTING Applicable Software 5 Over...

Страница 2: ...he equipment covered by this publication must be installed operated and main tained by qualified persons who are knowledgeable in the installation operation and maintenance of overhead electric power...

Страница 3: ...damaged or faded labels on the equipment be replaced immediately Replacement labels are available by contacting your nearest S C Sales Office S C Headquarters or S C Electric Canada Ltd DANGER DANGER...

Страница 4: ...1011 550 4...

Страница 5: ...electric distri bution equipment when electrical isolation and grounding procedures are not fol lowed The equipment described in this document must be operated and maintained by qualified persons who...

Страница 6: ...roblem you may need one or more of the following tools Multi meter 4 long 2 Phillips screwdriver 4 long 1 4 blade screwdriver NOTICE If the suggested troubleshooting steps do not resolve the problem c...

Страница 7: ...7 1011 550 Quick Reference Guide...

Страница 8: ...ON but the other LEDs do the LED is probably bad If none of the LEDs turn ON see Emphasis Italic LCD is blank C Check the Lockout Level and Lockout Time Delay setpoints The control device may not be...

Страница 9: ...problem with one of the files See To Install the IntelliLINK Software in the Setup Instruction Sheet 1011 530 for details Opening port COM1 Trying 9600 BAUD Connection Failed These messages appear in...

Страница 10: ...ge is zero on the Operation screen A Check the applicable potential devices Check that the wiring is securely connected to the potential devices and to the control device Check that the wiring is not...

Страница 11: ...n to the N G Voltage display without accepting the value press ESC LOCKOUT LEVEL button Pressing the LOCKOUT LEVEL button displays the following in order Lockout Level setpoint Lockout Time Delay setp...

Страница 12: ...for more details see To Start the IntelliLINK Software in the Setup Instruction Sheet 1011 530 If the IntelliLINK software is already started click the Operation button from any screen Figure 1 Opera...

Страница 13: ...display the capacitor bank neutral to ground voltage The maximum voltage displayed is 65 536 Volts divided by the voltage sensor ratio This field will display that maximum value even when voltage is...

Страница 14: ...o Ground Ratio This field shows the voltage ratio setting for the neutral to ground potential device Nominal Operating Frequency This is the nominal operating frequency in Hz for your distribution sys...

Страница 15: ...100 characters may help identify the control device to the SCADA master station operator and appears on all reports generated from the control device Product Information The Product Information scree...

Страница 16: ...the message Obsolete Release Encoded This is a six digit hexadecimal encoding of the name version information for the soft ware in the control This code is used by S C staff during software troublesho...

Отзывы: