![SAMUDRA SSM-N Series Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/samudra/ssm-n-series/ssm-n-series_instruction-and-operation-manual_3762632007.webp)
4
PUMP
l
content of 50 grams in 1000 ml of water. For higher sand content, the pump
hydraulics will wear out at a faster rate.
l
The impeller is dynamically balanced.
l
Both suction and delivery flanges with rubber gaskets are assembled on the
volute casing.
l
Strainer assembly, fitted on the pump suction flange, prevents entrance of
large-sized debris into the pump.
ELECTRICAL CONNECTION
l
OWS to be connected to a DOL starter are provided with a single 3-core PVC flat
cable.
l
OWS to be connected to a Star-Delta starter are provided with two separate 3-
core PVC flat cables.
7. PRE-INSTALLATION REQUIREMENTS
ARRANGEMENT FOR INSTALLATION
l
Use services of a professional and trained mechanic with experience in erecting
OWS.
l
Ensure proper safety during installation.
l
Ensure that the bottom of the well/water source is fairly level before erection of
the OWS.
GENERAL INSTALLATION PRECAUTIONS
l
Open packaging and note down Serial number and Model for future reference.
l
Ensure all fasteners are tightened properly.
l
Use prescribed pipe sizes as mentioned on the product name plate.
l
To prevent motor from getting exposed during pumping, ensure suction
strainer is fitted above the level of the motor. This is done by fitting one end of
the bend to the pump suction flange and the strainer to the other end of the
bend, thereby ensuring that the level does not fall below the strainer.
l
Use an NRV fitted on the delivery line when the OWS has high static delivery
heads.
l
Use a power cable without joints from OWS to Control Panel. It is not
recommended to use a power cable with large number of joints as this can result
in a significant voltage drop.
The pump is designed for pumping clear, cold water with a maximum sand
5
l
l
Check availability of three-phase power.
l
Ensure availability of Control Panel with inbuilt single-phase preventer, overload
protection, and High-Voltage and Low-Voltage protection.
l
Fill motor with pure drinking water before installation.
l
In case of rapid rise of water levels during rainy season, provide a throttle valve in
the delivery pipeline.
l
While installing the OWS, ensure that it is not subject to shock loads which can
damage OWS parts.
Check for level of silt at the bottom of well. De-silt if necessary.
*
If you detect damage or discrepancy in the product,
contact the dealer from whom the pump was purchased.
*
Do not use this pump for oil or toxic, acetic, corrosive and
flammable liquids. Pumping flammable liquids could
cause explosion.
*
Use eye bolts for lifting / lowering the OWS. Ensure
suitable precautions are taken while lifting and lowering
the product.
*
Use trained professionals to install the OWS
*
Use a power supply cable that has sufficient rating. Factor
in low-voltage operation.
*
Provide proper Earthing. Improper Earthing can cause
electrical shock
*
Use a Megger to verify insulation of the motor. Insulation
resistance should be 20 MÙ minimum.
*
Do not run OWS dry as it contains water lubricated
bearings and oilseals.
*
Mount the pump with its axis horizontal.
*
It is recommended to use a starter.
*
Check the bottom of the well. In case there is mud
accumulated at the bottom, de-silt the well.
*
Periodically de-silt the bottom of the well so that the
OWS rests on the rocky bottom.
CAUTION
Содержание SSM-N Series
Страница 1: ......