Prior to installation, unscrew the Brass Plugs 1 and 2 fitted on top of the motor as 
shown in Fig.3 below and fill the motor with pure drinking water until it overflows 
from the other filling hole. Gently rock the motor to release air bubbles and further 
top up if necessary. Then replace the two plugs.

Fig.3 Filling the Motor of OWS With Pure Drinking Water

The Brass Plug 3 mounted on the bottom of the motor is used for draining the water 
from within the motor. Ensure all three Brass Plugs are tightened to prevent leakage 
of water from within the motor. Check for leakages before lowering the OWS.

WATERPROOFING THE SUBMERSIBLE MOTOR CABLE-SUPPLY CABLE JOINT

CAUTION

*

Hazardous  voltage-Will  cause  death,  serious  injury, 

electrocution.

*

Disconnect all power before working on this equipment 

and that it cannot be accidentally switched ON.

9

l

DOL OWS Motors are supplied with a single 3-core PVC insulated flat cable of 

length 3 meters.

l

The free end of 3-core cable of the motor needs to be connected to supply cable 

from the control panel.

l

As  this  joint  is  always  nearly  submerged  under  water,  the  joint  needs  to  be 

waterproof.

Refer to sequence shown in Fig.4 below for insulating the cable joint for under 
water application:

PROCEDURE FOR JOINING AND INSULATING 

THE 3 CORE CONDUCTORS

PROCEDURE FOR INSULATING THE 

CABLE JOINT FOR UNDER-WATER CABLE

Fig.4 Cable Joints for Underwater Application

l

SD OWS Motors are provided with two separate 3-core PVC insulated flat cable 

each of 3 meters length.

l

Repeat procedure for both 3-core PVC flat cables from the motor to the two 

cables from the Control Panel.

Содержание SSM-N Series

Страница 1: ......

Страница 2: ...ontents in the Packing Box 1 4 Introduction about Product and Briefing 1 5 Schematic Drawings Indication of Parts 2 6 Key Product Specifications and Features 3 7 Pre Installation Requirements 4 8 Inst...

Страница 3: ...et submerged resulting in the motor getting damaged To overcome the issue of varying static suction lifts Open Well Submersible Monobloc OWS has been introduced Such a pump operates submerged Samudra...

Страница 4: ...NG SAND GUARD OIL SEAL FRONT COVER BASE PLATE BUSH THRUST PAD BALANCING COLLAR HEX HEADED BOLT WASHER EARTH INDICATION PLATE ROTOR WITH SHAFT STATOR STACK HEX HEADED BOLT HEX SOCKET SET SCREW COUNTER...

Страница 5: ...e thrust load generated by rotating impeller l A water lubricated counter thrust bearing is provided to limit movement of the shaft when the OWS is switched OFF l The rotors are dynamically balanced l...

Страница 6: ...ation l Ensure that the bottom of the well water source is fairly level before erection of the OWS GENERAL INSTALLATION PRECAUTIONS l Open packaging and note down Serial number and Model for future re...

Страница 7: ...oil or toxic acetic corrosive and flammable liquids Pumping flammable liquids could cause explosion Use eye bolts for lifting lowering the OWS Ensure suitable precautions are taken while lifting and...

Страница 8: ...pumping liquid exceeding 33 C as this may lead to product failure Do not switch ON pump if there is any human contact with pumped medium If any electrical leakage occurs this could prove fatal The OW...

Страница 9: ...are clean l Check direction of rotation l Connect measuring cable to ground conductor l Connect the other measuring cable to every core of the motor cable in succession l Ensure that insulation resist...

Страница 10: ...the Motor of OWS With Pure Drinking Water The Brass Plug 3 mounted on the bottom of the motor is used for draining the water from within the motor Ensure all three Brass Plugs are tightened to prevent...

Страница 11: ...rproof Refer to sequence shown in Fig 4 below for insulating the cable joint for under water application PROCEDURE FOR JOINING AND INSULATING THE 3 CORE CONDUCTORS PROCEDURE FOR INSULATING THE CABLE J...

Страница 12: ...onnect the OWS to Control Panel power up the OWS and observe the discharge from the pump l Next interchange any two phase wires power up the OWS and observe the discharge from the pump l In case the d...

Страница 13: ...ration while selecting cable size ELECTRICAL WIRING WORK CAUTION Be sure to install the ground wire securely Failure to observe this precaution could damage the pump and cause current leakage which ma...

Страница 14: ...proper packing in which they should remain until they are ready to be installed l The product should be stored in a closed dry and well ventilated room l Do not store the product under direct sunligh...

Страница 15: ...0 The Working Capitol Singapore 089109 Tel 65 6813 2111 Email info samudra net India Operations Office Block 1 Ground Floor Senthil Towers 1078 Avinashi Road Coimbatore 641 018 Tamilnadu India Tel 91...

Отзывы: