M8 L18 BOLT
X seam
Y seam
M8 L18 BOLT
2. Installation : Mounting Cabinets (Front installation)
34
M8 BOLT + NUT
M8 BOLT + NUT
③
③ ④
④
③
④
Hang one more cabinet/section while adjusting X seam
based on the cabinet below.
And disassemble some LED modules as shown.
Tighten the three cabinets/sections directly from inside the cabinet with bolts.
(doors open) At the same time, adjust the Z-seam based on the LED modules.
And
Reassemble the LED modules
Tighten the top every brackets to the L-shaped steel assembled on the H beam.
Cabinet/Section extending
sideways and upwards
Содержание XPR Series
Страница 1: ...Outdoor LED Installation Manual XPR Series Standard Cabinet LH080XPRZAS PZ Rev 0 9...
Страница 7: ...Standard Cabinet Outside 1 Product Information Standard Cabinet 7 Front Rear...
Страница 128: ...4 Control Room Setting System Matrix 128 System Matrix basic function Diagnostics Module...