2. Installation : Overview
16
Unboxing Cabinets & Accessories
Fan Assembly
Handling Cabinets
Mounting Cabinets
Y8/Signal B’d Assembly
Cable Connection
Power Connection
Control Room Setting
Pre-Working Before Cabinet Hang
Accessories Assembly
SW set up
◇
Installation Overview
- The installation follows the below order.
- Prior to the assembly, clearly identify the pre-work.
On-site HW Installation
On-site SW Setup Operation
Содержание XPR Series
Страница 1: ...Outdoor LED Installation Manual XPR Series Standard Cabinet LH080XPRZAS PZ Rev 0 9...
Страница 7: ...Standard Cabinet Outside 1 Product Information Standard Cabinet 7 Front Rear...
Страница 128: ...4 Control Room Setting System Matrix 128 System Matrix basic function Diagnostics Module...