WARNING
An electrolytic capacitor installed with the wrong polarity might explode.
CAUTION
Before servicing units covered by this service manual, read and follow the Safety Precautions section of
this manual.
NOTE
If unforeseen circumstances create conflict between the following servicing precautions and any of the
safety precautions, always follow the safety precautions.
1-2-1. General Servicing Precautions
Always unplug the unit’s AC power cord from the AC power source and disconnect the DC Power Jack before
1.
attempting to: (a) remove or reinstall any component or assembly, (b) disconnect PCB plugs or connectors, (c) connect
a test component in parallel with an electrolytic capacitor.
Some components are raised above the printed circuit board for safety. An insulation tube or tape is sometimes used.
2.
The internal wiring is sometimes clamped to prevent contact with thermally hot components. Reinstall all such elements
to their original position.
After servicing, always check that the screws, components and wiring have been correctly reinstalled. Make sure that
3.
the area around the serviced part has not been damaged.
Check the insulation between the blades of the AC plug and accessible conductive parts (examples: metal panels, input
4.
terminals and earphone jacks).
Insulation Checking Procedure: Disconnect the power cord from the AC source and turn the power switch ON. Connect
5.
an insulation resistance meter (500 V) to theblades of the AC plug. The insulation resistance between each blade of the
AC plug and accessible conductive parts (see above) should be greater than 1 megohm.
Always connect a test instrument’s ground lead to the instrument chassis ground before connecting the positive lead;
6.
always remove the instrument’s ground lead last.
1-3
1. Precautions
1-2. Servicing Precautions
Содержание UN KS8500F Series
Страница 10: ...ANNEX Exploded View Part List UN55KS8500FXZA FA01 1 1 Exploded View ANNEX 1 ANNEX Exploded View Part List...
Страница 22: ...ANNEX Exploded View Part List UN49KS8500FXZA FA01 1 1 Exploded View ANNEX 1 ANNEX Exploded View Part List...
Страница 48: ...2 15 2 Product specifications 2 4 NEW Key Features 2 4 1 16 New UI Smart Hub GAMES Service APPS Service...
Страница 49: ...2 16 2 Product specifications 2 4 2 Smart Things IoT Dongle required...
Страница 51: ...2 18 2 Product specifications 2 5 1 Voice Interaction 2 5 2 123 Key...
Страница 52: ...2 19 2 Product specifications 2 5 3 EXTRA Key...
Страница 73: ...PANEL If Noisy 1 Panel defective 4 11 4 Troubleshooting...
Страница 109: ...5 1 5 Wiring Diagram 5 Wiring Diagram 5 1 Layout Speaker SMPS Main T CON ONE CONNECT Function IR BT WIFI Module...
Страница 110: ...5 2 5 Wiring Diagram 5 2 Wiring Diagram 5 2 1 49 55 5 2 2 65...