Tools 81
To
ols
5.
If this is the first entry, enter a description of the task.
Otherwise, press the left soft key
for
Add New
and enter the
text. See "Entering Text" on page 24.
6.
Press the left soft key
for
Next
.
7.
Use the navigation keys left and right to select a priority for the
task:
Low
or
High
.
8.
Press the navigation keys down and use the keypad to enter the
Due Time
. Press the right soft key
to select
AM
or
PM
.
9.
Press the navigation keys down once.
10. Use the keypad to enter the
Due Date
.
11. Press the left soft key
for
Done
.
To view or edit existing Tasks
1.
Press
for
Menu
.
2.
Press
for
Tools
.
3.
Press
for
Calendar
.
4.
Press
for
Task List
.
5.
Highlight a task and press
. The task is displayed.
•
To edit the task, press the left soft key
for
Edit
.
•
To delete task, press the right soft key
for
Options
and
select
Erase
.
Note
:
To delete all the tasks, from the
Task List
menu, press the
right soft key for
Options
and select
Erase All
.
To change the state of Tasks
1.
Press
for
Menu
.
U430_UG.book Page 81 Monday, May 10, 2010 10:51 AM