
22_
installing the unit
installing the unit
REFRIGERANT PIPING WORKS
Aligning the pipes
•
Check that the flaring is properly made.
•
Align the center of the piping and sufficiently tighten the flare nut with fingers. Finally, tighten
the flare nut with torque wrench until the wrench clicks. When tightening the flare nut with
torque wrench, ensure the direction for tightening follows the arrow on the wrench.
•
Make sure to use ester oil to coat the flare connection section.
Pipe
Flare joint
Flare connection section
Outer diameter
(mm)
Connection
torque (kgf•cm)
Flare dimension
(mm)
Flare shape (mm)
ø6.35
145~175
8.70~9.10
ø9.52
333~407
12.80~13.20
ø12.70
505~615
16.20~16.60
ø15.88
630~769
19.30~19.70
R 0.4~0.8
90° ±
2°
45°
±
2°
Caution for connecting the pipe
• Blowing Nitrogen gas should be done when brazing the pipe.
• Make sure to use the provided flare joint.
• Make sure that there are any cracks on the bent pipe.
• Do not fasten the flare joint with excessive strength.
• Use ester oil to coat the flare connection section to prevent refrigerant leak.
R410A is a high pressure refrigerant therefore there is a risk of refrigerant leakage if
the flare connection is not coated by ester oil.
CAUTION
RD@@@HHXG_IM_E_33140-3.indd 22
2011-10-25 오후 2:57:43