Service Manual
Disassembly and Reassembly
5-8
Samsung Electronics
5.8 Main PBA
1. Before you remove the Main PBA, you should
remove: - Cover Right (Refer to the 5.7)
2. Unplug the all Connectors, as shown below.
3. The Connectors are located, as shown below.
4. Remove two screws and take out the Dummy
Bracket.
5. Remove six screws and take out the Main PBA.
Duplex
SMPS/HVPS
PBA
PTL
Cover Open
Thermistor
LSU
Toner
Sensor
DEVE
Motor
DPX_SOL
Key Panel
HDD(Optional)
Network
Card
Main Motor
Exit Sensor
Connector
PBA
Memory(Optional)
USB
Port
P1284
Port
SCF
Key Panel
Dummy
Bracket
Main PBA
Содержание ML-3561N Series
Страница 7: ...Samsung Electronics Service Manual Precautions 1 6 ...
Страница 19: ...Service Manual Summary of Product 4 2 Samsung Electronics 4 1 2 Rear View ...
Страница 39: ...Service Manual Summary of Product 4 22 Samsung Electronics ...
Страница 71: ...Service Manual Disassembly and Reassembly 5 32 Samsung Electronics ...
Страница 133: ...Exploded Views Parts List Service Manual 8 9 Samsung Electronics 8 7 Deve Motor Assembly 0 1 2 3 4 5 6 7 7 ...
Страница 152: ...Service Manual Block diagram 9 2 Samsung Electronics 9 2 System Timing Chart ...
Страница 153: ...Connection Diagram Service Manual 10 1 Samsung Electronics 10 10 10 Connection Diagram ...
Страница 154: ...Service Manual Connection Diagram 10 2 ...
Страница 155: ...Connection Diagram Service Manual 10 3 Samsung Electronics ...